BLD-Final | 1/26/2004 | 1/27/2004 | 1/27/2004 | A | PASS |
Russ Owen
|
|
|
Herb, ###-####. Ok perm oc schell and core finaled. 1/27/2004 11:14:23 AM
|
Permanent Occupancy | | 1/27/2004 | 1/27/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinkler finaled
|
BLD-Final | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 12:36:19 PM. Contact: ###-####. needs all required signatures. 12/10/2003 9:19:31 AM
|
BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Russ Owen
|
|
|
Ok temp oc needs mec and special inspection final report needs to be stamped by MTI engineer. also 2 doors need threshold touch up contractor on site. 12/10/2003 9:25:47 AM
|
FIRE-Final Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 9:04:17 AM. Contact: ###-####. gates to openable from the inside without special knowledge 12/9/2003 2:33:27 PM
|
BLD-Framing/Rough-in | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/14/2003 at 10:20:20 AM. Contact: ###-####. Interior walls ok but exterior exit door has swing wrong on wrong will resolve before final. 11/13/2003 11:54:46 PM
|