Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberBLD03-02563
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron #2
Customer NumberPCS#6075
ePlanReviewNo
Description
Micron Building #2 Addition & Remodel (Foundation & Structural Shell) - * To demolish and remove the exterior walls, roof, concrete slab & foundation at the 198 s.f. Room #100K at the west exterior wall. To construct a new 2 story addition at the west side of the building between grid lines 9&12. This permit is for the construction of the foundation and structural shell only. A separate permit will be required to finish this addition for occupancy. 1st flr. = 1386 s.f., 2nd flr. = 1233 s.f., total = 2619 s.f. This shell structure will include grade beam footings, tube steel columns and braces and wide flange steel beam floor and roof framing. Metal deck and concrete fill 2nd floor systems and a metal deck roof system. This addition is structurally independent of existing building. All construction per the approved plans. PC#654-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20046/8/20046/8/2004PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
BLD-Final5/14/20045/14/20045/14/2004APASS
DetailsJim Storey
l/c ok pending p&z
BLD-Conference5/6/20045/7/20045/7/2004APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry need p&z sign off do not need achd. 5/7/2004 10:50:21 AM
BLD-Aging Inspection3/19/20043/19/20043/19/2004 PART
DetailsJim Storey
wip 3/19/2004 9:11:32 AM
BLD-Concrete1/12/20041/14/20041/14/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/12/2004 at 9:47:23 AM. Contact: ###-####. placed with special insp. 1/15/2004 10:27:57 AM
BLD-Concrete1/9/20041/13/20041/13/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/9/2004 at 9:49:41 AM. Contact: ###-####. placed with special insp. 1/13/2004 10:50:40 AM
BLD-Concrete1/9/20041/12/20041/12/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/9/2004 at 9:48:52 AM. Contact: ###-####. wip for 2nd floor deck conctete placement./ 1/12/2004 11:30:27 AM
BLD-Concrete1/9/20041/12/20041/12/2004PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/9/2004 at 9:49:20 AM. Contact: ###-####. welding not per aproved shop drawnings at cant floor and roof brace/ need stair shops for tention posts atchments. 1/12/2004 2:46:52 PM
BLD-Footing12/29/20031/2/20041/2/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:08:12 PM. Contact: ###-####. placed w/si 1/2/2004 12:36:13 PM
BLD-Concrete12/30/200312/31/200312/31/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:07:05 PM. Contact: ###-####. steel erection ok top ot on pan deck ok pending special insp.reports. 12/31/2003 10:38:25 AM
BLD-Concrete12/29/200312/31/200312/31/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:07:24 PM. Contact: ###-####.
BLD-Concrete12/29/200312/30/200312/30/2003PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2003 at 2:07:05 PM. Contact: ###-####.
BLD-Footing12/19/200312/23/200312/23/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:20:49 AM. Contact: ###-####.
BLD-Footing12/22/200312/22/200312/22/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:20:32 AM. Contact: ###-####. steel erection in progess weldinh in progess special insp pending/ appears to be per aproved plan. 12/22/2003 2:36:04 PM
BLD-Footing12/19/200312/22/200312/22/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:20:32 AM. Contact: ###-####.
BLD-Footing12/19/200312/19/200312/19/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:20:11 AM. Contact: ###-####. wip 12/19/2003 3:39:18 PM