Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02811
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building #2
Customer NumberPCS6075
ePlanReviewNo
Description
Micron Building #2 - (PCS #02-20036075) - To finish the interior and exterior of a 2619 square foot, two story addition that includes a new stairway, accessible restrooms at the first and second floors and a locker room. The building addition structural frame is being constructed under BLD03-02563. All construction per the approved plans and attached comment list. (ESC 03-01436) #03-7231/JCM This approved plans was modified on 3/25/04 to downgrade the one-hour fire-resistive rating at Corridor #100A, as allowed by IBC, Table 1004.3.2.1. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/13/20045/14/20045/14/2004APASS
DetailsJim Storey
Jim...Rick will sign off am tomorrow...he has already looked at it...P&Z are supposed to come out am as well...Ill buzz you when that is done!; Phone #: ###-#### Internet Inspection Request from: Wayne Berry final ok 5/14/2004 10:51:32 AM
Code Occupancy Approval5/14/20045/14/20045/14/2004APASS
DetailsWm. Michael Meloy
Compliance met. 5/14/2004 11:12:55 AM
Permanent Occupancy 5/14/20045/14/2004 DONE
Details
Permanent Occupancy 5/14/20045/14/2004 DONE
Details
FIRE-Final Inspection5/13/20045/13/20045/13/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/13/2004 at 7:43:47 AM. Contact: ###-####. No card to sign - final okay 5/13/2004 2:32:52 PM
BLD-Conference5/6/20045/7/20045/7/2004APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry wip ok 5/7/2004 10:51:02 AM
FIRE-Final Inspection4/12/20044/13/20044/13/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/12/2004 at 1:29:17 PM. Contact: ###-####. Phased project - okay to use stairs 4/13/2004 11:20:16 AM
BLD-Final4/9/20044/9/20044/9/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/9/2004 at 6:14:22 AM. Contact: ###-####. fire stop 1/1/2pipe 4/12/2004 12:33:21 PM
FIRE-Final Inspection4/9/20044/9/20044/9/2004AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/9/2004 at 6:13:35 AM. Contact: ###-####. door closures on stairs; floor covering; need to test the detectors for door release; expansion joint not installed 4/9/2004 9:29:41 AM
BLD-Final4/1/20044/2/20044/2/2004APART
DetailsJim Storey
wayne; Phone #: ###-#### Internet Inspection Request from: Darla Downs 2 nd floor ok restarooms. 4/2/2004 11:15:20 AM
BLD-Final4/1/20044/1/20044/1/2004PCANC
DetailsJim Storey
wayne; Phone #: ###-#### Internet Inspection Request from: Darla Downs rolled over to am. 4/1/2004 4:27:36 PM
FIRE-Final Inspection4/1/20044/1/20044/1/2004PPART
DetailsRick Jackson
wayne; Phone #: ###-#### Internet Inspection Request from: Darla Downs okay to use second floor restrooms 4/1/2004 3:44:42 PM
BLD-Final3/24/20043/25/20043/25/2004APART
DetailsJim Storey
first floor men and womans restarm. ok for occ. use with progration of permited work. 3/25/2004 10:21:56 AM
BLD-Final3/23/20043/24/20043/24/2004ANR
DetailsJim Storey
WAYNE; Phone #: ###-#### Internet Inspection Request from: Darla Downs rolled over to am. 3/24/2004 4:19:05 PM
FIRE-Final Inspection3/23/20043/23/20043/23/2004PPART
DetailsRick Jackson
okay to use first floor restrooms only
BLD-Conference3/19/20043/22/20043/22/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/19/2004 at 11:28:41 AM. Contact: ###-####. loand 117 a to wyane. 3/22/2004 10:48:53 AM
BLD-Conference3/19/20043/19/20043/19/2004PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/19/2004 at 11:28:41 AM. Contact: ###-####. out of time. rolled over. 3/19/2004 4:41:45 PM
BLD-Conference3/10/20043/10/20043/10/2004PPART
DetailsJim Storey
wayne; Phone #: ###-#### Internet Inspection Request from: Darla Downs pending resubmatal for reduction in rated corridor. pending info. 3/10/2004 3:50:48 PM
BLD-Framing/Rough-in3/5/20043/5/20043/5/2004PPART
DetailsJim Storey
Call Joe Dalsoglio at Ext. 81086; Phone #: ###-#### Internet Inspection Request from: Dennis Holmes ok to cover shaft wall with 5/8 gyp. 3/5/2004 1:30:53 PM
BLD-Framing/Rough-in2/23/20042/23/20042/23/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/23/2004 at 6:39:41 AM. Contact: ###-####. walls ok for cover 1 st floor. 2/23/2004 4:17:45 PM
BLD-Framing/Rough-in2/23/20042/23/20042/23/2004ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/23/2004 at 6:39:41 AM. Contact: ###-####. rolled to pm. 2/23/2004 11:02:51 AM
FIRE-Sprinkler Rough-in2/23/20042/23/20042/23/2004PPART
DetailsRick Jackson
Wayne; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes okay to cover hard lids on first floor restroom; need resubmittals per plan review notes 2/23/2004 1:41:43 PM
BLD-Conference2/5/20042/6/20042/6/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/5/2004 at 2:22:32 PM. Contact: ###-####. exterior walls ok to insulate. 2/6/2004 10:16:20 AM
BLD-Footing2/2/20042/4/20042/4/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/2/2004 at 1:41:54 PM. Contact: ###-####. Talked to Mike Mitchell......MTI on site for Special insp. Will Re-call this insp in for 2/5 am 2/4/2004 12:15:53 PM
BLD-Framing/Rough-in2/3/20042/3/20042/3/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/2/2004 at 1:41:32 PM. Contact: ###-####. wip 2/3/2004 3:59:08 PM
BLD-Framing/Rough-in2/2/20042/3/20042/3/2004ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/2/2004 at 1:41:32 PM. Contact: ###-####. cloned 2/3/2004 11:29:30 AM
BLD-Framing/Rough-in1/27/20041/30/20041/30/2004ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/27/2004 at 12:20:53 PM. Contact: ###-####.
BLD-Framing/Rough-in1/27/20041/29/20041/29/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/27/2004 at 12:20:32 PM. Contact: ###-####.
BLD-Framing/Rough-in1/27/20041/28/20041/28/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/27/2004 at 12:20:13 PM. Contact: ###-####. wip 1/28/2004 3:36:57 PM
BLD-Framing/Rough-in1/21/20041/26/20041/26/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/21/2004 at 1:26:16 PM. Contact: ###-####. wip 1/26/2004 2:33:15 PM
BLD-Framing/Rough-in1/21/20041/26/20041/26/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/21/2004 at 1:26:52 PM. Contact: ###-####. wall clip to beam justified and being reinstaled. 1/26/2004 11:08:07 AM
BLD-Framing/Rough-in1/21/20041/22/20041/22/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/21/2004 at 1:25:57 PM. Contact: ###-####. exterior wall inprogess clip slip conection to be addressed. 1/22/2004 12:01:44 PM
BLD-Concrete12/19/200312/23/200312/23/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:26:11 AM. Contact: ###-####.
BLD-Concrete12/22/200312/22/200312/22/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:25:48 AM. Contact: ###-####. wip 12/22/2003 2:45:01 PM
BLD-Concrete12/19/200312/22/200312/22/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:25:48 AM. Contact: ###-####.
BLD-Concrete12/19/200312/19/200312/19/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2003 at 9:25:25 AM. Contact: ###-####. wip 12/19/2003 4:48:58 PM
BLD-Conference12/16/200312/17/200312/17/2003ACANC
DetailsJim Storey
Wayne; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes via phone call from wyane. 12/17/2003 8:42:10 AM
BLD-Footing12/11/200312/16/200312/16/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:36:49 PM. Contact: ###-####. wip 12/16/2003 1:43:49 PM
BLD-Footing12/11/200312/15/200312/15/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:36:09 PM. Contact: ###-####.
BLD-Footing12/11/200312/15/200312/15/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:36:29 PM. Contact: ###-####. wip slab on grade. 12/15/2003 1:13:35 PM
BLD-Conference12/10/200312/12/200312/12/2003PPASS
DetailsJim Storey
Wayne; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 2:00 pm 12/11/2003 9:59:34 AM
BLD-Footing12/11/200312/12/200312/12/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2003 at 3:35:52 PM. Contact: ###-####.wip 12/12/2003 3:17:25 PM
FIRE-Conference12/10/200312/12/200312/12/2003PPART
DetailsRick Jackson
Wayne; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes met with Wayne about occupying this project in phases 12/12/2003 4:07:13 PM
BLD-Footing12/5/200312/10/200312/10/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/5/2003 at 2:13:05 PM. Contact: ###-####. wip 12/10/2003 9:17:55 AM
BLD-Footing12/5/200312/9/200312/9/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/5/2003 at 2:10:40 PM. Contact: ###-####. wip 12/9/2003 10:31:38 AM
BLD-Footing12/5/200312/8/200312/8/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/5/2003 at 2:12:46 PM. Contact: ###-####. reports pending. 12/8/2003 11:01:23 AM