BLD-Final | 5/6/2004 | 5/6/2004 | 5/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm 5/6/2004 2:54:55 PM
|
Permanent Occupancy | | 5/6/2004 | 5/6/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 5/3/2004 | | PASS |
|
|
|
SIGNED OFF FINAL. THE BARE GROUND IN FRONT WAS PART OF ACHD REQUIRED CURB AND THEY BONDED WITH THEM.
|
BLD-Final | 4/28/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Tom Arcoraci
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for temp occ needs letter from spec insp and eng 4/30/2004 2:25:07 PM
|
FIRE-Final Inspection | 4/28/2004 | 4/29/2004 | 4/29/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide insulation in the eve over the exterior canopy, repair the exit signs on second floor and in the computer lab 4/29/2004 9:00:22 AM
|
FIRE-Final Inspection | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 4/29/2004 3:40:18 PM
|
FIRE-Final Inspection | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide approved drawings for the fire sprinkler final. Remove thumbturns from the class room doors (total of 3), Repair exit signs neare womens restroom, computer lab and the two on the second floor, Repair exit sign outside of the kitchen, provide emergency light in main corridor, basement, basement stairs and outside of the kitchen, Repair the emergency light at the womens restroom, Repair emergency light/exit sign in classroom 141. 4/28/2004 11:45:45 AM
|
BLD-Framing/Rough-in | 4/13/2004 | 4/13/2004 | 4/13/2004 | P | PART |
Russ Owen
|
|
|
grid ceiling inspection please////ED; Phone #: ###-#### Internet Inspection Request from: Barbara Moore All ok except putting in perimeter wires in class room 115 , 116, north end west side 1 room "east wall side" only. will verify at next inspection. 4/12/2004 11:35:15 PM 4/12/2004 11:36:06 PM
|
BLD-Framing/Rough-in | 3/3/2004 | 3/4/2004 | 3/4/2004 | A | PART |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok some interior walls as marked on plans. with mezz for furnaces. 3/3/2004 7:08:55 PM
|
BLD-Framing/Rough-in | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PART |
Jim Sly
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK to rock New, large glue lam beam. Beam runs N/S and located at West end of Bldg. Verified attachments to existing Purlins and beam Per Eng. 2/24/2004 11:29:03 AM
|
BLD-Concrete | 2/11/2004 | 2/11/2004 | 2/11/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/11/2004 at 8:44:18 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/9/2004 | 2/10/2004 | 2/10/2004 | A | PART |
Tom Arcoraci
|
|
|
wall insp- in the cafateria-- ed- ###-#### cafe ok for cover 2/10/2004 9:57:56 AM
|