Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02891
StatusFinaled
Name SOCIAL SECURITY ADMINISTRATION
Site Address 1505 N MCKINNEY ST
Project NameSocial Security Adm
Customer Number 
ePlanReviewNo
Description
Social Security Administration - Disability Determination Service (Addition and Remodel) - To add a 5,000 square foot, one story wood framed office addition to the southwest corner of an existing 14,800 square foot, one story wood framed office building. This permit is also for the remodel of the existing building, including updating all restrooms to be fully handicapped accessible. Total area of building with addition is 19,800 square feet. This permit also includes related site work at the south side of the building. All construction per the approved plans and attached comment list. PC#744-03/DRH03-00166/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/24/20049/24/20049/24/2004PPASS
DetailsTom Arcoraci
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection9/24/20049/24/20049/24/2004PPASS
DetailsTroy Cobbley
life safety finaled 9/24/2004 10:28:34 AM
Code Occupancy Approval9/23/20049/23/20049/23/2004PPASS
DetailsScott M.Brown
ALL IN AS REQUIRED FINAL SIGNED 9/23/2004 2:58:02 PM
Permanent Occupancy 9/23/20049/23/2004 DONE
Details
FIRE-Final Inspection9/10/20049/10/20049/10/2004PFAIL
DetailsTroy Cobbley
Provide two emergency lights in the open office area as per plans and provide correct door hardware on the main entry/exit 9/10/2004 4:39:28 PM
BLD-Framing/Rough-in8/16/20048/16/20048/16/2004PPART
DetailsLane Manuel
TIM; Phone #: ###-#### Internet Inspection Request from: Annette Moore

offices 13 thru 16 t-bar ok 8/16/2004 2:30:20 PM
BLD-Framing/Rough-in8/5/20048/6/20048/6/2004APART
DetailsLane Manuel
tim ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. t-bar passed. contr. to leave 3 areas exposed for c/n mech, per dixie. 8/6/2004 10:16:36 AM
FIRE-Conference8/4/20048/4/20048/4/2004PDONE
DetailsTroy Cobbley
A duct smoke detector is to be added to RTU8 8/4/2004 4:27:18 PM
BLD-Framing/Rough-in7/29/20047/29/20047/29/2004PPART
DetailsTom Arcoraci
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip ok to cover beam 7/29/2004 3:27:59 PM
BLD-Final7/26/20047/27/20047/27/2004ANR
DetailsTom Arcoraci
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection7/26/20047/27/20047/27/2004AFAIL
DetailsTroy Cobbley
Inspection was for multiple rooms in the next phase of the project. See city approved plans, sheets A2.2, A2.3 and A2.5 for the specific rooms and deficiencies. There are card readers and door magnets being installed. I contacted Nick with Synergy and Jason with AEI about IFC and IBC requirements for access controlled egress doors. These items are not shown on the approved fire alarm plans. Plans will require possible resubmittals. 7/27/2004 10:27:32 AM
BLD-Framing/Rough-in7/22/20047/22/20047/22/2004PPART
DetailsTom Arcoraci
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes gid ok partial 7/22/2004 2:35:42 PM
BLD-Framing/Rough-in7/15/20047/15/20047/15/2004PPART
DetailsTom Arcoraci
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north west side ok for cover needs eng letter for beam hanger change 7/15/2004 12:40:17 PM
BLD-Conference7/2/20047/2/20047/2/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/2/2004 at 8:44:16 AM. Contact: ###-####.
BLD-Final7/2/20047/2/20047/2/2004PPASS
DetailsTom Arcoraci
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ of phase 2 7/2/2004 1:23:15 PM
FIRE-Final Inspection7/2/20047/2/20047/2/2004PPART
DetailsTroy Cobbley
Phase II ok to occupy. Still need to test the main fire alarm system. 7/2/2004 9:58:40 AM
FIRE-Final Inspection7/2/20047/2/20047/2/2004PCANC
DetailsTroy Cobbley
duplicate inspection 7/2/2004 9:56:19 AM
BLD-Conference7/1/20047/1/20047/1/2004APASS
DetailsTom Arcoraci
contractor repairing 1 hr in old building 7/1/2004 9:46:31 AM
BLD-Other6/28/20046/28/20046/28/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/28/2004 at 6:26:33 AM. Contact: ###-####. old building not V-a only all new construction in this area inspected as V-a 6/28/2004 10:28:19 AM 6/28/2004 10:29:03 AM
BLD-Framing/Rough-in6/24/20046/25/20046/25/2004APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/24/2004 at 1:30:21 PM. Contact: ###-####. Roof/ceiling assembly OK above restroom hard lid ceilings....Note Need to add blocks to create double top plate and firecaulk edge of rock on ceiling, - or - rock face of Non bearing interior walls above hard lid. ( Restroom to the North). 6/25/2004 12:31:20 PM 6/25/2004 12:32:58 PM 6/25/2004 12:34:26 PM
BLD-Conference6/22/20046/22/20046/22/2004PDONE
DetailsTroy James
Scheduled by a contractor via Hello! on 6/22/2004 at 8:35:27 AM. Contact: ###-####.
BLD-Final6/14/20046/14/20046/14/2004APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/14/2004 at 6:04:11 AM. Contact: ###-####. ok first phase 6/14/2004 10:17:41 AM
FIRE-Conference6/10/20046/11/20046/11/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/10/2004 at 6:15:55 PM. Contact: ###-####. Scheduled for first phase this afternoon 6/11/2004 2:36:04 PM
FIRE-Final Inspection6/11/20046/11/20046/11/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/11/2004 at 10:22:38 AM. Contact: ###-####. Phase I okay to occupy 6/11/2004 2:45:57 PM
Code Occupancy Approval Temp6/8/20046/8/20046/7/2004ADONE
DetailsScott M.Brown
SIGNEDE OFF TEMP CCUPANCY DUE TO UTILITY WORK, THEY CLAIM PARKING LOT AND LAND SCAPE TO BE IN PLACE IN 2-3- WEEKS, DUE TO BEING PHASE WORK I DID NOT REQUIRED BOND BECAUSE WE HAVE OTHER PERMITS/OCCUPANCY TO HOLD. 6/8/2004 9:28:23 AM
BLD-Other6/5/20046/7/20046/7/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/5/2004 at 4:35:18 PM. Contact: ###-####. grid and firestop above ok 6/7/2004 10:15:32 AM
FIRE-Conference6/4/20046/4/20046/4/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/4/2004 at 7:00:34 AM. Contact: ###-####. This is a phased project and the GC wanted to know about occupying the new addition without having the new parking lot completed - the area must have FD vehicle access surface; smoke/fire dampers are installed in new addition and there isn't a plan as to how they are activated - GC will contact architect 6/4/2004 10:57:13 AM
BLD-Other5/6/20045/7/20045/7/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/6/2004 at 8:20:16 PM. Contact: ###-####.
BLD-Energy code compliance5/5/20045/6/20045/6/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/5/2004 at 4:40:58 PM. Contact: ###-####.
BLD-Framing/Rough-in5/6/20045/6/20045/6/2004APART
DetailsTom Arcoraci
framing ok check fire chalk at walls check ceiling and corr at grid 5/6/2004 8:54:01 AM
BLD-Framing/Rough-in5/5/20045/6/20045/6/2004ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/5/2004 at 4:39:32 PM. Contact: ###-####.
BLD-Framing/Rough-in5/5/20045/5/20045/5/2004ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/5/2004 at 7:26:31 AM. Contact: ###-####. called contractor can find no approval to insulate walls, and now almost complete with insulatiom, he will recall when insulation is complete and they are out of the building,and 408 will be back for job history check to verify framing , as noted ceiling insulation only by last entry. 5/5/2004 2:53:56 PM
BLD-Framing/Rough-in4/29/20044/29/20044/29/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/29/2004 at 8:04:36 AM. Contact: ###-####. ok to insulate ceiling 4/29/2004 2:20:46 PM
BLD-Framing/Rough-in4/28/20044/28/20044/28/2004APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/28/2004 at 6:42:11 AM. Contact: ###-####. ext shear ok 4/28/2004 9:42:48 AM
BLD-Framing/Rough-in4/28/20044/28/20044/28/2004PPART
DetailsTom Arcoraci
BLD-Foundation3/18/20043/18/20043/18/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/18/2004 at 9:19:16 AM. Contact: ###-####. wip 3/18/2004 3:34:05 PM
BLD-Footing3/16/20043/16/20043/16/2004APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/16/2004 at 7:20:51 AM. Contact: ###-####. spec insp on site 3/16/2004 10:27:44 AM 3/16/2004 10:27:57 AM