Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-02947
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building #3
Customer NumberPSC6360
ePlanReviewNo
Description
Micron Building #3 & #1 - Remodel Pollution Abatement for Production Tools * To demo the Pollution Abatement area and remodel for fab area. This work to include exterior wall modifications, constructing a new raised concrete loading dock with equipment lift. The interior remodel will include clean room walls, raised floor, HEPA ceiling system and all related plumbing, mechanical and electrical to create a dry etch bay and two plenum areas. This work also includes the remodel of the mechanical area at the second floor. This work is being done on the first and second floors of Building #3 between grid lines 1&4 and A&D. This permit also includes modification work at corridor 101P and reverse door swing at door #101B at Chemical Distribution Room 102I. This permit also includes the relocation and addition of some TCS units and related piping, mechanical and electrical at the second floor of Building #1 between grid lines B&C and 3&6. All construction per the approved plans and attached comment list. PC#759-03/JCM A deferred submittal for the second exit must be approved and installed before occupancy will be approved, see plan reviewer activity 3/25/04. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20046/8/20046/8/2004PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
FIRE-Final Inspection5/13/20045/14/20045/14/2004APASS
DetailsRick Jackson
Internet Inspection Request from: Wayne Berry
FIRE-Final Inspection5/6/20045/6/20045/6/2004ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/6/2004 at 6:52:31 AM. Contact: ###-####. Alarms not ready so this will be inspected at alarm final 5/6/2004 8:48:34 AM
BLD-Conference4/23/20044/23/20044/23/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2004 at 7:29:31 AM. Contact: ###-####. strucral steel ok 4/23/2004 2:49:34 PM
BLD-Footing4/20/20044/22/20044/22/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:08:31 AM. Contact: ###-####. placed with special insp. 4/22/2004 8:17:34 AM
BLD-Footing4/20/20044/22/20044/22/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:09:35 AM. Contact: ###-####. placed with special insp. 4/22/2004 3:55:21 PM
BLD-Conference4/20/20044/21/20044/21/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:07:54 AM. Contact: ###-####. reviewed handrail requriments. 4/21/2004 9:19:29 AM
BLD-Footing4/20/20044/20/20044/20/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:07:54 AM. Contact: ###-####. placed w/si 4/20/2004 2:33:08 PM
BLD-Conference4/16/20044/16/20044/16/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/16/2004 at 9:26:26 AM. Contact: ###-####.