BLD-Final | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | PASS |
Jim Sly
|
|
|
after 2 pm please///ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK for Perm Occ.... ():
|
FIRE-Final Inspection | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 8/23/2005 | 8/23/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/18/2005 | 8/19/2005 | 8/19/2005 | P | FAIL |
Troy Cobbley
|
|
|
Still need to verify that the sprinkler spacing in the conference room and the additional dry pendants are approved with resubmittals. When the fire sprinkler permit is finaled the life safety can be finaled since items have been checked.
|
Code Occupancy Approval | | | 8/5/2005 | | PASS |
|
|
|
Meets compliance with DRH03-00204
|
BLD-Other | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | PASS |
Tom Arcoraci
|
|
|
ron NOte: ceiling cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 6/8/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Jim Sly
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 6/6/2005 | 6/6/2005 | 6/7/2005 | P | PART |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Continuous insp of baffles for venting attic.
|
FIRE-Sprinkler Rough-in | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | DONE |
Troy Cobbley
|
|
|
Inspection was for inspection of insulation in the eaves. It appears to be ok to me. Insulation measured leaves less than 6" space in the combustible concealed space.
|
BLD-Framing/Rough-in | 5/20/2005 | 5/20/2005 | 5/20/2005 | P | PASS |
Jim Sly
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PART |
Jim Sly
|
|
|
ron - Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 5/13/2005 4:31:09 PM All framing and shear OK.....Need d to check fireblocking at energy code insp 5/13/2005 5:48:06 PM
|
BLD-Energy code compliance | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | NR |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Energy code compliance | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PART |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Exterior walls OK. 5/10/2005 4:01:47 PM
|
BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 | A | NR |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/9/2005 | 5/9/2005 | 5/9/2005 | P | FAIL |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 5/9/2005 4:09:10 PM
|
BLD-Framing/Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PART |
Jim Sly
|
|
|
ron Note: shear nail inspection on frame; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Shear nailing and roof nailing OK. 4/15/2005 3:04:36 PM
|
BLD-Footing | 2/2/2005 | 2/3/2005 | 2/3/2005 | A | PART |
Jim Sly
|
|
|
###-#### - RON Strata on site. 2/3/2005 11:28:51 AM
|
BLD-Footing | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PART |
Jim Sly
|
|
|
###-#### ron S. W. corner of Bldg. and Pier pads for Portacochere. 2/2/2005 2:01:19 PM 2/2/2005 2:03:46 PM
|
BLD-Foundation | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PART |
Jim Sly
|
|
|
###-#### ron Partial walls OK pending Strata insp, tests and approvals. 2/2/2005 2:02:55 PM
|
BLD-Footing | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | PART |
Jim Sly
|
|
|
ron ###-#### Footing OK pending STRATA special inspection, tests, and approvals. 1/27/2005 2:32:35 PM
|
BLD - Request for Extension | 1/6/2005 | 1/7/2005 | 1/7/2005 | | PASS |
Jim Sly
|
|
|
Going to start work on this project approx 1/10/05 BAS
|
BLD-Aging Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | | DONE |
Jim Sly
|
|
|
WIP 8/6/2004 4:24:07 PM
|
BLD-Aging Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | | DONE |
Jim Sly
|
|
|
WIP 8/6/2004 4:24:07 PM
|