Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-03031
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 4840 N CLOVERDALE RD
Project NameSt Lukes Internal Medicine
Customer Number23-775
ePlanReviewNo
Description
Saint Lukes Internal Medicine Building * To construct a new 11,274sq.ft. single story, wood framed, fully sprinklered, medical office building, with a 600 sq.ft covered driveway entry canopy and a 459 sq.ft covered patio area, along with related site improvements. All construction per the approved plans and attached comment list. MJP DRH03-00204 PC#783-03
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/23/20058/23/20058/23/2005PPASS
DetailsJim Sly
after 2 pm please///ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Perm Occ.... ():
FIRE-Final Inspection8/23/20058/23/20058/23/2005PPASS
DetailsForrest France
Fire life safety finaled.
Permanent Occupancy 8/23/20058/23/2005 DONE
Details
FIRE-Final Inspection8/18/20058/19/20058/19/2005PFAIL
DetailsTroy Cobbley
Still need to verify that the sprinkler spacing in the conference room and the additional dry pendants are approved with resubmittals. When the fire sprinkler permit is finaled the life safety can be finaled since items have been checked.
Code Occupancy Approval  8/5/2005 PASS
Meets compliance with DRH03-00204
BLD-Other7/21/20057/22/20057/22/2005APASS
DetailsTom Arcoraci
ron NOte: ceiling cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance6/8/20056/8/20056/8/2005PPASS
DetailsJim Sly
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance6/6/20056/6/20056/7/2005PPART
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Continuous insp of baffles for venting attic.
FIRE-Sprinkler Rough-in5/31/20055/31/20055/31/2005PDONE
DetailsTroy Cobbley
Inspection was for inspection of insulation in the eaves. It appears to be ok to me. Insulation measured leaves less than 6" space in the combustible concealed space.
BLD-Framing/Rough-in5/20/20055/20/20055/20/2005PPASS
DetailsJim Sly
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in5/13/20055/13/20055/13/2005PPART
DetailsJim Sly
ron - Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 5/13/2005 4:31:09 PM All framing and shear OK.....Need d to check fireblocking at energy code insp 5/13/2005 5:48:06 PM
BLD-Energy code compliance5/9/20055/10/20055/10/2005ANR
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance5/10/20055/10/20055/10/2005PPART
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Exterior walls OK. 5/10/2005 4:01:47 PM
BLD-Framing/Rough-in5/6/20055/9/20055/9/2005ANR
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in5/9/20055/9/20055/9/2005PFAIL
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 5/9/2005 4:09:10 PM
BLD-Framing/Rough-in4/14/20054/15/20054/15/2005PPART
DetailsJim Sly
ron Note: shear nail inspection on frame; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Shear nailing and roof nailing OK. 4/15/2005 3:04:36 PM
BLD-Footing2/2/20052/3/20052/3/2005APART
DetailsJim Sly
###-#### - RON Strata on site. 2/3/2005 11:28:51 AM
BLD-Footing2/2/20052/2/20052/2/2005PPART
DetailsJim Sly
###-#### ron S. W. corner of Bldg. and Pier pads for Portacochere. 2/2/2005 2:01:19 PM 2/2/2005 2:03:46 PM
BLD-Foundation2/2/20052/2/20052/2/2005PPART
DetailsJim Sly
###-#### ron Partial walls OK pending Strata insp, tests and approvals. 2/2/2005 2:02:55 PM
BLD-Footing1/27/20051/27/20051/27/2005PPART
DetailsJim Sly
ron ###-#### Footing OK pending STRATA special inspection, tests, and approvals. 1/27/2005 2:32:35 PM
BLD - Request for Extension1/6/20051/7/20051/7/2005 PASS
DetailsJim Sly
Going to start work on this project approx 1/10/05 BAS
BLD-Aging Inspection8/6/20048/6/20048/6/2004 DONE
DetailsJim Sly
WIP 8/6/2004 4:24:07 PM
BLD-Aging Inspection8/6/20048/6/20048/6/2004 DONE
DetailsJim Sly
WIP 8/6/2004 4:24:07 PM