Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00038
StatusFinaled
Name THE REEF RESTAURANT
Site Address 105 S 6TH ST
Project NameSTATESMAN BUILDING
Customer Number 
ePlanReviewNo
Description
(THE REEF RESTAURANT - OLD STATESMAN BLDG - 2ND FLR) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction. To remodel an existing 6,416 square foot 2nd floor restaurant tenant space for a new restaurant tenant and to expand the floor area by constructing a 1,704 square foot 2nd floor outdoor terrace over an existing roof. Work is to include 2 restrooms altered to be accessible to the disabled, interior nonbearing walls, interior stairways, new roof beams, expanded openings in existing masonry walls, kitchen equipment, millwork, and finishes. The terrace will be supported by existing masonry walls and will be constructed of steel beams, wood joists, and "TREX" decking. The terrace will have one rooftop structure having a steel frame and palm roofing and one rooftop structure having steel frames and noncombustible roofing. A demolition permit (BLD04-00048) was issued earlier. DRH03-00224 **CJW** CONSTRUCTION OF THE TERRACE SHALL NOT COMMENCE UNTIL ALL THE CONCERNS OF THE CONSULTANT ENGINEER HAVE BEEN RESOLVED. (3-17-04) THE TERRACE DESIGN WAS APPROVED BY THE CONSULTANT ENGINEER ON MARCH 15, 2004. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/13/20047/13/20047/13/2004PPASS
DetailsDave Hannah
ok for perm occ 7/13/2004 12:45:19 PM
Permanent Occupancy 7/13/20047/13/2004 DONE
Details
BLD-Final7/1/20047/2/20047/2/2004APART
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ on out side area also 7/2/2004 10:51:13 AM
FIRE-Final Inspection7/1/20047/1/20047/1/2004PPASS
DetailsRick Jackson
Phase 2 (terrace) is completed; fire final okay for perm occupancy 7/1/2004 4:08:08 PM
BLD-Final6/29/20046/30/20046/30/2004PNR
DetailsDave Hannah
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Final Inspection6/29/20046/30/20046/30/2004PNR
DetailsRick Jackson
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes The fire sprinkler work for the terrace is not ready 6/30/2004 2:29:26 PM
Code Occupancy Approval  6/29/2004 PASS
OK SO SIGNED OFF FINAL, ONLY QUESTION WAS COLOR OF UNPAINED BRICKS, THEY ARE GOING TO CLEAN PAINT OFF AND GO NATURAL BRICKS SOON, FINAL SIGNED OFF
BLD-Conference6/14/20046/14/20046/14/2004PDONE
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Conference6/14/20046/14/20046/14/2004PPART
DetailsRick Jackson
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Met with GC about sprinkler requirements for new bar 6/14/2004 3:15:58 PM
BLD-Final6/3/20046/3/20046/3/2004PPART
DetailsDave Hannah
###-#### kent ok for temp occ owner will open the int part and work on the outside area int still needs ada signage at rest rooms 6/3/2004 4:03:14 PM
FIRE-Final Inspection6/3/20046/3/20046/3/2004PPART
DetailsRick Jackson
Phase I completed - the terrace isn't ready to occupy but the rest of the area is okay to occupy 6/3/2004 4:28:16 PM
BLD-Conference6/1/20046/2/20046/2/2004ADONE
DetailsDave Hannah
BLD-Conference6/2/20046/2/20046/2/2004PDONE
DetailsDave Hannah
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Conference6/2/20046/2/20046/2/2004PCANC
DetailsRick Jackson
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes inspection scheduled for 6/3 6/2/2004 1:26:18 PM
BLD-Conference6/1/20046/1/20046/1/2004PCANC
DetailsDave Hannah
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Conference5/13/20045/13/20045/13/2004APART
DetailsRick Jackson
Met with Kent and left correction notice concerning the bamboo and thatch canopies. After conferring with Carl Westphall, Sam Rogers, Dave Miller and Dave Hannah the Fire Stop fire retardant is approved with the following requirements: the thatch must be immersed for treatment, a special inspector shall be obtained after presenting credentials to plan review for approval to observe the materials are treated per manufacturer's instruction and a test of treated materials will conducted with the inspectors present to verify it meets the criteria specified by Fire Stop; open flames are not permitted 5/13/2004 12:47:51 PM
FIRE-Conference5/4/20045/5/20045/5/2004APART
DetailsRick Jackson
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Met with Kent about the bamboo and thatch canopies that were being installed; they weren't shown on the approved plans; left correction notice to provide flame spread and smoke development and if fire treated to provide certification from manufacturer of fire treatment 5/5/2004 2:14:18 PM
BLD-Conference4/28/20044/29/20044/29/2004PDONE
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Sprinkler Rough-in4/15/20044/16/20044/16/2004APART
DetailsRick Jackson
kent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Combustible cavity under stage area has been filled with insulation 4/16/2004 10:48:15 AM
BLD-Conference4/15/20044/15/20044/15/2004PDONE
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIRE-Conference4/6/20044/7/20044/7/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/6/2004 at 10:03:09 AM. Met with electrical GC and Larry Rose; a new fire alarm panel will be installed with submitals; the kitchen extinguishing system will require monitoring by new panel 4/7/2004 3:04:26 PM
BLD-Framing/Rough-in3/16/20043/17/20043/17/2004APART
DetailsDave Hannah
KENT; Phone #: ###-#### Internet Inspection Request from: Darla Downs kitchen and food prep area ok to cover steel stud walls after elec and plb r/is 3/18/2004 8:10:14 AM