Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00044
StatusFinaled
Name EXPRESS
Site Address 350 N MILWAUKEE ST Unit: 2097
Project NameBTS - #2097
Customer Number 
ePlanReviewNo
Description
(EXPRESS)(BOISE TOWNE SQUARE-SPACE 2097) To remodel three tenant spaces 2097,2096, & 2098 to create one new 6,859 sq.ft. tenant per approved plans. Work to include, construction of all new noncombustible partitions, new storefront, installation of three roll-up security grills, installation of suspended ceiling, construction of two new accessible restrooms, installation of rack storage per engineering, installation of miscelaneous counters, cabinets and shelving and related finishes. This building is fully fire sprinklered and contains a smoke evacuation system, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall be maintained as installed under the 1985 UBC. (pc#015-04) RMH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/10/20045/10/20045/10/2004PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/10/2004 at 10:02:29 AM. Contact: ###-####. ok perm oc. 5/10/2004 4:03:53 PM
BLD-Final5/5/20045/6/20045/6/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/5/2004 at 2:13:26 PM. Contact: ###-####. need accessible counters.ok for temp oc. 5/6/2004 5:30:54 PM f 5/6/2004 5:30:56 PM 5/6/2004 5:31:12 PM
FIRE-Final Inspection5/5/20045/6/20045/6/2004APASS
DetailsTroy Cobbley
fire life safety finaled 5/6/2004 11:21:08 AM
BLD-Final5/3/20045/5/20045/5/2004PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/3/2004 at 1:22:20 PM. Contact: ###-####., needs fire life safety, failed this pm. 5/5/2004 1:47:30 PM
FIRE-Final Inspection5/5/20045/5/20045/5/2004PFAIL
DetailsTroy Cobbley
Patch holes in rated wall in storeroom areas. Move smoke detector in open ceiling area to deck.
BLD-Framing/Rough-in3/31/20044/1/20044/1/2004APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/31/2004 at 2:34:48 PM. Contact: ###-####.
BLD-Framing/Rough-in3/23/20043/24/20043/24/2004APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/23/2004 at 10:03:36 AM. Contact: ###-####. Ok except some changes over the front roll up doors, need addl detail from engineer, contractor on site notified. 3/23/2004 9:38:14 PM