BLD-Final | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/10/2004 at 10:02:29 AM. Contact: ###-####. ok perm oc. 5/10/2004 4:03:53 PM
|
BLD-Final | 5/5/2004 | 5/6/2004 | 5/6/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 2:13:26 PM. Contact: ###-####. need accessible counters.ok for temp oc. 5/6/2004 5:30:54 PM f 5/6/2004 5:30:56 PM 5/6/2004 5:31:12 PM
|
FIRE-Final Inspection | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 5/6/2004 11:21:08 AM
|
BLD-Final | 5/3/2004 | 5/5/2004 | 5/5/2004 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/3/2004 at 1:22:20 PM. Contact: ###-####., needs fire life safety, failed this pm. 5/5/2004 1:47:30 PM
|
FIRE-Final Inspection | 5/5/2004 | 5/5/2004 | 5/5/2004 | P | FAIL |
Troy Cobbley
|
|
|
Patch holes in rated wall in storeroom areas. Move smoke detector in open ceiling area to deck.
|
BLD-Framing/Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/31/2004 at 2:34:48 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/23/2004 at 10:03:36 AM. Contact: ###-####. Ok except some changes over the front roll up doors, need addl detail from engineer, contractor on site notified. 3/23/2004 9:38:14 PM
|