Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00079
StatusFinaled
Name EKC INC
Site Address 121 N 9TH ST
Project NameSpring Run Plaza Phase I add.
Customer Number 
ePlanReviewNo
Description
Spring Run Plaza - (Shell & Core Addition) - To construct a new 7,450 square foot, six story with 2200 square foot basement additions on the southeast side of an existing 58,500 square foot, six story with 13,750 square foot basement office building. This permit also includes exterior canopies and related site improvements. Addition first floor: 2090 sq. ft., second & third floors: 1980 sq, ft., fourht thru sixth floor:465 sq. ft., additions total: 7450 sq. ft.. Shell and core work to include floors, roof, exterior envelope and installation of two elevators within a two-hour shaft. All construction per the approved plans and attached comment list. PC#028-04/DRH03-00230/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/9/20089/9/20089/9/2008 PASS
DetailsDave Hannah
DOC - Permit Finaled9/9/20089/9/20089/9/2008PPASS
DetailsDave Hannah
BLD-Final7/8/20087/8/20087/8/2008PPASS
DetailsDave Hannah
BLD-Aging Inspection7/7/20087/7/20087/8/2008 PART
DetailsDave Hannah
FIRE-Final Inspection2/26/20082/27/20082/28/2008APASS
DetailsForrest France
Correction notice items are complete, fire life safety finaled.
BLD-Aging Inspection2/1/20082/1/20082/1/2008 DEFR
DetailsDave Hannah
sent to fire
FIRE-Final Inspection11/30/200711/30/200712/4/2007PFAIL
DetailsForrest France
Need to verify functional EM lighting.
FIRE-Final Inspection10/1/200710/2/200710/3/2007ANR
DetailsForrest France
Need project related fire sprinkler permit finals.
BLD-Aging Inspection8/16/20078/16/20078/20/2007 DEFR
DetailsDave Hannah
BLD-Final4/11/20064/12/20064/17/2006ADONE
DetailsForrest France
wip, final pending alarm and sprinkler permit finals.
BLD-Aging Inspection11/18/200511/18/200511/18/2005 PASS
DetailsTom Arcoraci
FIRE-Conference3/1/20053/1/20053/1/2005PDONE
DetailsTroy Cobbley
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
BLD-Framing/Rough-in2/22/20052/22/20052/22/2005PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####.
BLD-Framing/Rough-in2/22/20052/22/20052/22/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####. expansion jiont fire stop at elevators ok to cover 2/22/2005 1:22:16 PM
FIRE-Conference2/21/20052/22/20052/22/2005ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####.
BLD-Framing/Rough-in2/8/20052/8/20052/8/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/8/2005 at 9:14:16 AM. Contact: ###-####. fire damper 6th floor ok and soffit main lobby area 1st floor 2/9/2005 7:51:39 AM
BLD-Framing/Rough-in2/4/20052/4/20052/4/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/4/2005 at 9:20:40 AM. Contact: ###-####. nain floor lobby and elev lobby ok to cover cieling also ok to cover elev front walls every floor 2/4/2005 3:55:47 PM
BLD-Framing/Rough-in2/1/20052/2/20052/2/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/1/2005 at 4:23:02 PM. Contact: ###-####. stair tower idaho street side first layer shafthwall repair ok 2thru 6th floor ok to cover 2/2/2005 10:52:58 AM
BLD-Framing/Rough-in1/20/20051/20/20051/20/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/20/2005 at 9:40:01 AM. Contact: ###-####. mec shaft patches ok first side 1/20/2005 3:16:12 PM
BLD-Conference1/17/20051/18/20051/18/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/17/2005 at 3:20:16 PM. Contact: ###-####.elevator shaft problems arct will reveiw and submit drawnings 1/18/2005 2:38:50 PM
BLD-Conference12/2/200412/2/200412/2/2004PPART
DetailsDave Hannah
? about fill infront of entryway 12/3/2004 8:22:13 AM
BLD-Framing/Rough-in10/11/200410/12/200410/12/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2004 at 2:10:19 PM. Contact: ###-####. ext walla steel studs 1st, 2nd and 3rd floors ok to cover ext 10/12/2004 10:54:31 AM
BLD-Conference9/20/20049/21/20049/21/2004APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2004 at 2:24:48 PM. Contact: ###-####. 2hr fire rating at floor lines around out side of bld 9/21/2004 10:18:24 AM
BLD-Framing/Rough-in9/3/20049/3/20049/3/2004PPART
DetailsDave Hannah
BLD-Concrete8/9/20048/9/20048/9/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/9/2004 at 10:56:51 AM. Contact: ###-####.
BLD-Foundation7/9/20047/9/20047/9/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/9/2004 at 10:31:07 AM. Contact: ###-####. mti on site 7/9/2004 4:03:16 PM
BLD-Footing6/30/20046/30/20046/30/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/30/2004 at 10:17:12 AM. Contact: ###-####.
BLD-Foundation6/23/20046/24/20046/24/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/23/2004 at 3:10:06 PM. Contact: ###-####.
BLD-Footing6/16/20046/16/20046/16/2004PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/16/2004 at 10:17:56 AM. Contact: ###-####.
BLD-Conference6/9/20046/10/20046/10/2004ADONE
DetailsDave Hannah
pre job meeting at 9:00am at office on 9th st
BLD-Conference6/3/20046/4/20046/4/2004PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/3/2004 at 9:08:50 AM. Contact: ###-####.