BLD-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/7/2008 | 7/7/2008 | 7/8/2008 | | PART |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/28/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items are complete, fire life safety finaled.
|
BLD-Aging Inspection | 2/1/2008 | 2/1/2008 | 2/1/2008 | | DEFR |
Dave Hannah
|
|
|
sent to fire
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 12/4/2007 | P | FAIL |
Forrest France
|
|
|
Need to verify functional EM lighting.
|
FIRE-Final Inspection | 10/1/2007 | 10/2/2007 | 10/3/2007 | A | NR |
Forrest France
|
|
|
Need project related fire sprinkler permit finals.
|
BLD-Aging Inspection | 8/16/2007 | 8/16/2007 | 8/20/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 | A | DONE |
Forrest France
|
|
|
wip, final pending alarm and sprinkler permit finals.
|
BLD-Aging Inspection | 11/18/2005 | 11/18/2005 | 11/18/2005 | | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | DONE |
Troy Cobbley
|
|
|
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
|
BLD-Framing/Rough-in | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####. expansion jiont fire stop at elevators ok to cover 2/22/2005 1:22:16 PM
|
FIRE-Conference | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 9:14:16 AM. Contact: ###-####. fire damper 6th floor ok and soffit main lobby area 1st floor 2/9/2005 7:51:39 AM
|
BLD-Framing/Rough-in | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 9:20:40 AM. Contact: ###-####. nain floor lobby and elev lobby ok to cover cieling also ok to cover elev front walls every floor 2/4/2005 3:55:47 PM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 4:23:02 PM. Contact: ###-####. stair tower idaho street side first layer shafthwall repair ok 2thru 6th floor ok to cover 2/2/2005 10:52:58 AM
|
BLD-Framing/Rough-in | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 9:40:01 AM. Contact: ###-####. mec shaft patches ok first side 1/20/2005 3:16:12 PM
|
BLD-Conference | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 3:20:16 PM. Contact: ###-####.elevator shaft problems arct will reveiw and submit drawnings 1/18/2005 2:38:50 PM
|
BLD-Conference | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Dave Hannah
|
|
|
? about fill infront of entryway 12/3/2004 8:22:13 AM
|
BLD-Framing/Rough-in | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 2:10:19 PM. Contact: ###-####. ext walla steel studs 1st, 2nd and 3rd floors ok to cover ext 10/12/2004 10:54:31 AM
|
BLD-Conference | 9/20/2004 | 9/21/2004 | 9/21/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/20/2004 at 2:24:48 PM. Contact: ###-####. 2hr fire rating at floor lines around out side of bld 9/21/2004 10:18:24 AM
|
BLD-Framing/Rough-in | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | PART |
Dave Hannah
|
|
|
|
BLD-Concrete | 8/9/2004 | 8/9/2004 | 8/9/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/9/2004 at 10:56:51 AM. Contact: ###-####.
|
BLD-Foundation | 7/9/2004 | 7/9/2004 | 7/9/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/9/2004 at 10:31:07 AM. Contact: ###-####. mti on site 7/9/2004 4:03:16 PM
|
BLD-Footing | 6/30/2004 | 6/30/2004 | 6/30/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/30/2004 at 10:17:12 AM. Contact: ###-####.
|
BLD-Foundation | 6/23/2004 | 6/24/2004 | 6/24/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/23/2004 at 3:10:06 PM. Contact: ###-####.
|
BLD-Footing | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/16/2004 at 10:17:56 AM. Contact: ###-####.
|
BLD-Conference | 6/9/2004 | 6/10/2004 | 6/10/2004 | A | DONE |
Dave Hannah
|
|
|
pre job meeting at 9:00am at office on 9th st
|
BLD-Conference | 6/3/2004 | 6/4/2004 | 6/4/2004 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 9:08:50 AM. Contact: ###-####.
|