Permit Information
Permit NumberBLD04-00279
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 110 N CURTIS RD
Project NameHAZ-MAT HIGH-PILED STORAGE
Customer Number 
ePlanReviewNo
Description
Brico Of Idaho * Install Racking. To install building access through the east (back) wall into an existing tank storage area which will now go away (not be allowed) due to the a south containment wall being demolished. Also to install 7 new automatic and manual smoke heat vents in the High-Piled Combustible storage area of this facility. All per approved plans on file.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/1/20049/2/20049/2/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/1/2004 at 4:55:00 PM. Contact: ###-####. ok for perm 9/2/2004 3:13:58 PM
FIRE-Final Inspection9/1/20049/2/20049/2/2004APASS
DetailsTroy Cobbley
Fire life safety finaled. Overspacing of the smoke heat vents was approved by Dave Miller on 9-1-04 as long as the approved smoke heat vents had been installed. Per the data sheets the smoke heat vents are approved. 9/2/2004 9:45:54 AM
BLD-Final8/30/20048/31/20048/31/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/30/2004 at 8:19:48 PM. Contact: ###-####. needs fire ok 8/31/2004 3:32:43 PM
FIRE-Final Inspection8/30/20048/31/20048/31/2004AFAIL
DetailsTroy Cobbley
Space heat vents are overspaced. See review note "C". Provide data sheet for revised smoke heat vents. Manual type, as approved, was not installed. 8/31/2004 5:15:43 PM
BLD-Final8/30/20048/31/20048/30/2004ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/30/2004 at 5:14:16 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 30 2004 8:18PM.
BLD-Final8/26/20048/27/20048/27/2004PNR
DetailsLane Manuel
Scheduled by a contractor via Hello! on 8/26/2004 at 3:27:09 PM. Contact: ###-####.
fire insp. has correction issues, and additional final insp. to do before bldg. dept. final 8/27/2004 3:22:24 PM
BLD-Final8/20/20048/20/20048/20/2004PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/20/2004 at 7:58:59 AM. Contact: ###-####.
BLD-Footing8/20/20048/20/20048/20/2004PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/20/2004 at 7:57:30 AM. Contact: ###-####.
BLD-Framing/Rough-in8/20/20048/20/20048/20/2004PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/20/2004 at 7:58:14 AM. Contact: ###-####.