Permanent Occupancy | | 7/12/2004 | 7/12/2004 | | DONE |
|
|
|
|
BLD-Final | 7/8/2004 | 7/9/2004 | 7/9/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/8/2004 at 6:47:01 PM. Contact: ###-####.ok for perm occ 7/9/2004 4:02:57 PM
|
FIRE-Final Inspection | 7/8/2004 | 7/9/2004 | 7/9/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/8/2004 at 6:45:23 PM. Contact: ###-####.
|
BLD-Final | 7/8/2004 | 7/8/2004 | 7/8/2004 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/7/2004 at 1:10:08 PM. Contact: ###-####.
|
BLD-Final | 7/7/2004 | 7/8/2004 | 7/8/2004 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/7/2004 at 1:10:08 PM. Contact: ###-####.
|
BLD-Wall cover | 7/7/2004 | 7/7/2004 | 7/7/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/7/2004 at 8:43:08 AM. Contact: ###-####. 1hr and 2 hr shafts ok to cover 7/7/2004 4:06:19 PM
|
FIRE-Final Inspection | 7/7/2004 | 7/7/2004 | 7/7/2004 | P | FAIL |
Rick Jackson
|
|
|
Occupant load sign; rated access door for dampers in shaft on third floor; extinguisher; skirting around top of refer unit; sprinkler obstruction in north corner by storage too close to head 7/7/2004 4:24:00 PM
|
BLD-Wall cover | 7/5/2004 | 7/6/2004 | 7/6/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/5/2004 at 4:52:54 PM. Contact: ###-####. ok to cover two hr shaft 3rd and 4th floors only problem with joist and beams in ceiling and roof 7/6/2004 10:27:15 AM
|
BLD-Conference | 7/1/2004 | 7/2/2004 | 7/2/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2004 at 6:13:41 PM. Contact: ###-####.
|
BLD-Wall cover | 6/1/2004 | 6/2/2004 | 6/2/2004 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 1:57:42 PM. Contact: ###-####.
|
BLD-Wall cover | 6/2/2004 | 6/2/2004 | 6/2/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 1:57:42 PM. Contact: ###-####. ok to start covering walls 6/2/2004 3:41:23 PM
|
BLD-Wall cover | 5/28/2004 | 6/1/2004 | 6/1/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/28/2004 at 4:31:51 PM. Contact: ###-####. No plans on site. 6/1/2004 11:21:03 AM
|