Permit Number | BLD04-00448 |
Status | Finaled |
Name |
ST ALPHONSUS (BRIDGE SUPPORT)
|
Site Address |
1055 N CURTIS RD
|
Project Name | ST ALS-BRIDGE SUPPORT/DEMO |
Customer Number | |
ePlanReview | No |
Description |
(SAINT ALPHONSUS REGIONAL MEDICAL CENTER, BID PACKAGE #1A, BRIDGE SUPPORT, DEMOLITION & EXIT SYSTEMS MAINTENANCE) New work includes construction of 2-hour exit passageway to maintain exit system past new construction at two locations; then, demolition of the existing north side entrance canopy / lobby, McCleary conference center, and 3rd level of the bridge-link; to remodel the 2nd level of the bridge-link for vital utilities, sprinkler / alarm systems and access between north & south towers (all other uses of the bridge-link are eliminated); to provide new structural, fire-resistive, steal / concrete columns, extended below the proposed future basement excavation depths and FR steal beams to support the remaining link on the new columns; to remove the existing beams & columns under link, all per approved plans, notes thereon by reviewing agencies and all reviewing agency attached plan reveiw comments and conditons as part of the approved plans. A bond for $2,001,653 is posted for the demolition work. PC04-125/drs
|