BLD-Final | 8/30/2004 | 8/31/2004 | 8/31/2004 | A | PASS |
Tom Arcoraci
|
|
|
after 11:00 please//pat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok pending plumbing final 8/31/2004 10:57:37 AM
|
Permanent Occupancy | | 8/31/2004 | 8/31/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/23/2004 | 8/24/2004 | 8/24/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 8/24/2004 9:46:20 AM
|
BLD-Final | 8/18/2004 | 8/20/2004 | 8/20/2004 | P | CANC |
Tom Arcoraci
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Annette Moore
|
BLD-Final | 8/9/2004 | 8/10/2004 | 8/10/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/9/2004 at 11:47:26 AM. Contact: ###-####. ok for temp on east side 8/10/2004 3:19:17 PM
|
FIRE-Final Inspection | 8/9/2004 | 8/10/2004 | 8/10/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the exit discharge lighting has been installed and the door hardware has been installed on the west half of the building. The east half of the building is ok to occupy as all life safety items other than discharge lighting is OK. 8/10/2004 11:01:29 AM
|
BLD-Final | 8/6/2004 | 8/9/2004 | 8/9/2004 | A | CANC |
Tom Arcoraci
|
|
|
PAT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 8/5/2004 | 8/6/2004 | 8/6/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/5/2004 at 10:38:26 AM. Contact: ###-####.
|
BLD-Other | 8/4/2004 | 8/6/2004 | 8/6/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 2:29:45 PM. Contact: ###-####. susp. ceiling @ TI ok. East side of bldg. 8/6/2004 9:07:16 AM
|
FIRE-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide approved door hardware on doors marked on drawing sheet A1.1. Provide exit discharge illumination per building review notes #22. Install ceiling tile at sprinkler pendants. Test duct detectors. Relocate ducting at duct detector #1. Provide 30cd strobes in rooms as marked on plans and measure EOL voltage. Provide map at FACP
|
BLD-Energy code compliance | 7/30/2004 | 8/3/2004 | 8/3/2004 | A | PASS |
Tom Arcoraci
|
|
|
Pat Trumble -- fire wall.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 6/17/2004 | 6/18/2004 | 6/18/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/17/2004 at 1:09:45 PM. Contact: ###-####. 6/18/2004 8:57:58 AM ok to cover hard ceiling in opp. rms 6/18/2004 8:58:56 AM
|
BLD-Framing/Rough-in | 6/7/2004 | 6/8/2004 | 6/8/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 2:55:27 PM. Contact: ###-####. ok for cover 6/8/2004 2:17:14 PM
|
BLD-Framing/Rough-in | 6/2/2004 | 6/4/2004 | 6/4/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/2/2004 at 9:44:52 AM. Contact: ###-####.
|
BLD-Conference | 5/18/2004 | 5/20/2004 | 5/20/2004 | A | PASS |
Tom Arcoraci
|
|
|
pat ; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to extend a wall to roof deck 5/20/2004 9:46:43 AM 5/20/2004 9:47:08 AM
|