BLD-Final | 11/8/2004 | 11/8/2004 | 11/8/2004 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm occ pending shell and core perm signatures 11/8/2004 9:44:26 AM 11/8/2004 9:47:41 AM
|
Code Occupancy Approval | 11/5/2004 | 11/8/2004 | 11/8/2004 | A | CANC |
Tom Arcoraci
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Permanent Occupancy | | 11/8/2004 | 11/8/2004 | | DONE |
|
|
|
|
BLD-Final | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | NR |
Jim Sly
|
|
|
Gary-call 1/2 hr before you go out; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Told gary to call shell/core permit in B 4 .... or at the same time as T I 11/5/2004 12:11:35 PM
|
BLD-Conference | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | CANC |
Lane Manuel
|
|
|
gave c/n for ti.
ok to issue temp c of o.
|
FIRE-Final Inspection | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Foundation | 6/11/2004 | 6/14/2004 | 6/14/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 6:36:40 AM. Contact: ###-####.
|
BLD-Footing | 6/11/2004 | 6/11/2004 | 6/11/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 6:36:19 AM. Contact: ###-####. MTI passed fill for compaction. 2500psi Conc design.....No special insp Req. Footing OK. 6/11/2004 9:26:39 AM
|
BLD-Foundation | 6/3/2004 | 6/4/2004 | 6/4/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 6:39:05 AM. Contact: ###-####.
|
BLD-Footing | 6/3/2004 | 6/3/2004 | 6/3/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 6:38:46 AM. Contact: ###-####.
|