BLD-Framing/Rough-in | 9/19/2005 | 9/19/2005 | 9/19/2005 | P | PASS |
Jim Sly
|
|
|
hershel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 9/19/2005 | 9/19/2005 | 9/19/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 9/14/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Mike Jordan
|
|
|
hershel ###-#### Jim PLEASE call Perry Paine to meet you out there as there are plan review issues. Inspected footings for additional post. Footings were found to be in compliance as per pep drawings.
|
BLD-Final | 4/8/2004 | 4/12/2004 | 4/12/2004 | A | FAIL |
Jim Sly
|
|
|
###-#### Hershel C/N I was Called to do a final inspection......Patio cover finished. Owner did not call for footing insp or frame inspection. Approved plan shows all footings ( below posts) to be 12" diam and 24" deep....Unable to verify. The framing that is showing is wrong....ie...frame members for beams installed flat in leiu of on edge, and not breaking above posts. Owner stated that he was not going to change anything and wanted a refund for his permit. I smiled and said " do what you have to do" I left the correction notice and departed. 4/12/2004 12:06:53 PM 4/12/2004 12:10:24 PM
|