Permit Information
Permit NumberBLD04-00705
StatusFinaled
Name GOLIS CONSTRUCTION
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly High Weight Rm.
Customer Number 
ePlanReviewNo
Description
(Bishop Kelly High School)(Weight Room/Athletic Training Center Addition) * To construct a 3,865 s.f. Type IIB single story athletic training center addition to the existing gymnasium building. This building is fully fire sprinklered for area. CUP99-0003 MOD 1. The construction type has been downgraded to IIB from II1hr.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/12/20048/12/20048/12/2004PPASS
DetailsTom Arcoraci
ok for perm occ
Permanent Occupancy 8/12/20048/12/2004 DONE
Details
BLD-Final8/6/20048/6/20048/6/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/6/2004 at 7:48:35 AM. Contact: ###-####. ok for temp occ needs eng letters of ok 8/6/2004 2:19:12 PM
FIRE-Final Inspection8/6/20048/6/20048/6/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 8/6/2004 1:40:34 PM
FIRE-Final Inspection8/4/20048/4/20048/4/2004AFAIL
DetailsTroy Cobbley
Provide one fire extinguisher per the fire review notes and provide "No Parking-Fire Lane" verbage on the red curbing at the new addition
Code Occupancy Approval  8/4/2004 PASS
ALL IN AS REQUIRED, AS A NOTE THE NEW PARKING SPACES ARE NOT A REQUIREMENT THE TOTAL SCHOOL NUMBER OF SPACES ARE MORE THEN REQUIRED SO THIS ADDITIONAL PARKING IS NOT BEING PUT IN, FINAL SIGNED OFF.
BLD-Aging Inspection7/27/20047/27/20047/27/2004 NR
DetailsTom Arcoraci
BLD-Foundation5/26/20045/27/20045/27/2004PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/26/2004 at 2:41:29 PM. Contact: ###-####. not reay still needs addtional items done, they can recall for tommorow or have special inspection for the pour Terricon is doing cyliders. Noted this with concrete contractor at the site. 5/27/2004 4:01:39 PM
BLD-Footing5/26/20045/26/20045/26/2004PPART
DetailsRuss Owen
Exterior footings only, the footings at the existing building wall are not done. 5/26/2004 4:53:20 PM I called the structural enginner and told him of the footing being blocked off for the large pipe under it , for about 14" . He said this would be ok wall above will not be affected by this. Concrete truck on site now.Note: the approved set of prints is not to be found, so contractor will have them at next inspection, I did have the engineers stamped set in which I borrowed from Teracon. /2004 4:54:48 PM 5/26/2004 4:55:38 PM 5/26/2004 4:59:26 PM
BLD-Footing5/25/20045/26/20045/26/2004PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/25/2004 at 9:33:20 PM. Contact: ###-####. Work will be inspected by MTI. 5/26/2004 1:51:25 PM