BLD-Final | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 7:34:06 AM. Contact: ###-####. Ok for perm occ. Reveiwed letter from arch. deleating 2hr walls, letter from special insp. agency and letter freom structural engineer aproving non conformances with special insp. Actuall insp. performed by Jim Sly.
|
Permanent Occupancy | | 5/22/2006 | 5/22/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/18/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Aging Inspection | 4/14/2006 | 4/14/2006 | 4/17/2006 | | NR |
Troy Cobbley
|
|
|
I received a phone call from CM Company today and the lady stated that the door locks would be blanked off.
|
FIRE-Final Inspection | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | FAIL |
Troy Cobbley
|
|
|
The cut sheet that was provided for the thumbturn locks was for "Falcon" but the manufacture of the locks is "CorbinRusswin". Need the correct cut sheet.
|
FIRE-Final Inspection | 12/29/2005 | 12/30/2005 | 12/30/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide data sheets to prove thumbturn dead bolts are ADA approved
|
Permanent Occupancy | | 10/26/2005 | 10/26/2005 | | DONE |
|
|
|
|
BLD-Final | 10/21/2005 | 10/21/2005 | 10/21/2005 | P | NR |
Jim Sly
|
|
|
|
BLD-Final | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | CANC |
Jim Sly
|
|
|
call for access///dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Final | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PART |
Jim Sly
|
|
|
dan -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp.....Per PDS approval Cert #5264 C/N Architect to submit letter omitting 1 hr walls, Need final letter from Eng, Need final Affidavit from specail insp agency.
|
FIRE-Final Inspection | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Final the fire sprinkler permit. Provide occupant load signs per review note #27. Provide one additional extinguisher in the northwest corner of the gym. Provide exit discharge lighting as discussed at each exit from the new building per building review comments note #46. Provide signage for fire access as shown on sheet A1.0
|
FIRE-Final Inspection | 8/15/2005 | 8/16/2005 | 8/16/2005 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 8/15/2005 at 2:11:25 PM. Contact: ###-####.
|
Code Occupancy Approval | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF
|
BLD-Conference | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 8:49:08 AM. Contact: ###-####. Discussed Req for final.
|
BLD-Final | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | CANC |
Jim Sly
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Inspection cancelled from web by: Marsha Smylie
|
BLD-Framing/Rough-in | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 3:05:25 PM. Contact: ###-####. Glenn Robnett Architect.... wants Grid design catagory C. 5/23/2005 10:13:05 AM
|
BLD-Framing/Rough-in | 5/23/2005 | 5/23/2005 | 5/23/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/23/2005 at 9:56:33 AM. Contact: ###-####. Grid OK...may check for spacer bars at final. 5/23/2005 3:44:32 PM
|
BLD-Other | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 2:50:12 PM. Contact: ###-####. Architect to verify ceiling grid standard (25-2) or Per 2000 UBC 803.8.1.1 ASTM 635 636. Plans are contradicting. 5/20/2005 4:08:36 PM
|
BLD-Conference | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/13/2005 at 8:40:24 AM. Contact: ###-####. Grid above stage appears OK. 5/13/2005 1:49:45 PM
|
BLD-Framing/Rough-in | 4/25/2005 | 4/25/2005 | 4/26/2005 | P | PART |
Dave Hannah
|
|
|
inspect sheetrock shaft joist space area inside floor ok
|
BLD-Framing/Rough-in | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 1:39:44 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/21/2005 | 4/21/2005 | 4/21/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 8:13:47 AM. Contact: ###-####. interior partition wall and shaft ok, informed contractor to complete rated assembly at joist space before sheetrocking lid 4/21/2005 4:03:16 PM
|
BLD-Framing/Rough-in | 3/2/2005 | 3/3/2005 | 3/3/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 1:04:35 PM. Contact: ###-####. roof sheathing nailing ok east entry area 3/3/2005 2:32:07 PM
|
BLD-Footing | 9/30/2004 | 10/1/2004 | 10/1/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/30/2004 at 1:56:13 PM.
partial footings/ to receive MTI special insp. notes 10/1/2004 10:26:28 AM
|