Permit Information
Permit NumberBLD04-00709
StatusFinaled
Name CM COMPANY
Site Address 925 N CLOVERDALE RD
Project Nameboise valley adventist school
Customer Number 
ePlanReviewNo
Description
To construct a new 17,175 sq. ft. single story, Type VB, fully fire sprinklered gyminasium & class addition. The addition is considered as a separate building with a 2 hour fire wall separating the existing Type V1hr building. Other work includes all site improvements, paving and landscaping. All work is per approved plans and attachments. Fire sprinklers are used for area in the addition and the existing building shall also be fire sprinklered to satisfy IFC fire flow requirements.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20065/22/20065/22/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/22/2006 at 7:34:06 AM. Contact: ###-####. Ok for perm occ. Reveiwed letter from arch. deleating 2hr walls, letter from special insp. agency and letter freom structural engineer aproving non conformances with special insp. Actuall insp. performed by Jim Sly.
Permanent Occupancy 5/22/20065/22/2006 DONE
Details
FIRE-Final Inspection5/18/20065/19/20065/19/2006PPASS
DetailsTroy Cobbley
life safety finaled
BLD-Aging Inspection4/14/20064/14/20064/17/2006 NR
DetailsTroy Cobbley
I received a phone call from CM Company today and the lady stated that the door locks would be blanked off.
FIRE-Final Inspection1/11/20061/12/20061/12/2006AFAIL
DetailsTroy Cobbley
The cut sheet that was provided for the thumbturn locks was for "Falcon" but the manufacture of the locks is "CorbinRusswin". Need the correct cut sheet.
FIRE-Final Inspection12/29/200512/30/200512/30/2005AFAIL
DetailsTroy Cobbley
Provide data sheets to prove thumbturn dead bolts are ADA approved
Permanent Occupancy 10/26/200510/26/2005 DONE
Details
BLD-Final10/21/200510/21/200510/21/2005PNR
DetailsJim Sly
BLD-Final8/25/20058/26/20058/26/2005ACANC
DetailsJim Sly
call for access///dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Final8/26/20058/26/20058/26/2005PPART
DetailsJim Sly
dan -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
OK for Temp.....Per PDS approval Cert #5264 C/N Architect to submit letter omitting 1 hr walls, Need final letter from Eng, Need final Affidavit from specail insp agency.
FIRE-Final Inspection8/18/20058/18/20058/18/2005PFAIL
DetailsTroy Cobbley
Final the fire sprinkler permit. Provide occupant load signs per review note #27. Provide one additional extinguisher in the northwest corner of the gym. Provide exit discharge lighting as discussed at each exit from the new building per building review comments note #46. Provide signage for fire access as shown on sheet A1.0
FIRE-Final Inspection8/15/20058/16/20058/16/2005PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 8/15/2005 at 2:11:25 PM. Contact: ###-####.
Code Occupancy Approval8/9/20058/9/20058/9/2005PPASS
DetailsScott M.Brown
FINAL SIGNED OFF
BLD-Conference8/8/20058/8/20058/8/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/8/2005 at 8:49:08 AM. Contact: ###-####.
Discussed Req for final.
BLD-Final6/17/20056/17/20056/17/2005PCANC
DetailsJim Sly
ed; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Inspection cancelled from web by: Marsha Smylie
BLD-Framing/Rough-in5/20/20055/23/20055/23/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/20/2005 at 3:05:25 PM. Contact: ###-####. Glenn Robnett Architect.... wants Grid design catagory C. 5/23/2005 10:13:05 AM
BLD-Framing/Rough-in5/23/20055/23/20055/23/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/23/2005 at 9:56:33 AM. Contact: ###-####. Grid OK...may check for spacer bars at final. 5/23/2005 3:44:32 PM
BLD-Other5/19/20055/20/20055/20/2005AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/19/2005 at 2:50:12 PM. Contact: ###-####. Architect to verify ceiling grid standard (25-2) or Per 2000 UBC 803.8.1.1 ASTM 635 636. Plans are contradicting. 5/20/2005 4:08:36 PM
BLD-Conference5/13/20055/13/20055/13/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/13/2005 at 8:40:24 AM. Contact: ###-####. Grid above stage appears OK. 5/13/2005 1:49:45 PM
BLD-Framing/Rough-in4/25/20054/25/20054/26/2005PPART
DetailsDave Hannah
inspect sheetrock shaft joist space area inside floor ok
BLD-Framing/Rough-in4/22/20054/25/20054/25/2005ANR
DetailsTroy James
Scheduled by a contractor via Hello! on 4/22/2005 at 1:39:44 PM. Contact: ###-####.
BLD-Framing/Rough-in4/21/20054/21/20054/21/2005PPART
DetailsTroy James
Scheduled by a contractor via Hello! on 4/21/2005 at 8:13:47 AM. Contact: ###-####. interior partition wall and shaft ok, informed contractor to complete rated assembly at joist space before sheetrocking lid 4/21/2005 4:03:16 PM
BLD-Framing/Rough-in3/2/20053/3/20053/3/2005PPART
DetailsTroy James
Scheduled by a contractor via Hello! on 3/2/2005 at 1:04:35 PM. Contact: ###-####. roof sheathing nailing ok east entry area 3/3/2005 2:32:07 PM
BLD-Footing9/30/200410/1/200410/1/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/30/2004 at 1:56:13 PM.
partial footings/ to receive MTI special insp. notes 10/1/2004 10:26:28 AM