Code Occupancy Approval | 4/13/2005 | 4/13/2005 | 4/13/2005 | A | PASS |
Scott M.Brown
|
|
|
DUMPSTER SCREENING AND LANDSCAPE DONE FINAL SIGNED OFF 4/13/2005 9:08:54 AM
|
Permanent Occupancy | | 4/13/2005 | 4/13/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled
|
BLD-Final | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 9:02:01 PM. Contact: ###-####. ok for perm occ 4/7/2005 2:23:45 PM
|
BLD-Final | 2/24/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Lane Manuel
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
temp. c of o ok.
need grippable handrails 2/25/2005 2:45:25 PM
|
FIRE-Final Inspection | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until I'm provided with the outdoor list for the discharge light or the light is changed to an outdoor listed. 2/25/2005 1:40:10 PM
|
FIRE-Final Inspection | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide address facing cole road. Provide fire extinguishers per review comments. Provide exit discharge lighting at north exit per plans 2/25/2005 8:42:53 AM
|
Code Occupancy Approval Temp | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | FAIL |
Scott M.Brown
|
|
|
NEED TO BOND FOR $1000.00 FOR LANDSCAPE 2/24/2005 2:49:53 PM
|
BLD-Energy code compliance | 1/18/2005 | 1/19/2005 | 1/19/2005 | P | PASS |
Lane Manuel
|
|
|
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 11:35:20 AM. Contact: ###-####.
ok to rock mezzanine area 1/18/2005 4:18:08 PM
|
BLD-Wall cover | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 11:33:43 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Lane Manuel
|
|
|
cameron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
gave tentative approval to contractor to cover ceiling (pending plumb. insp. approval) 1/12/2005 3:33:07 PM
|
BLD-Framing/Rough-in | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PART |
Lane Manuel
|
|
|
Camron -Roof sheeting; Phone #: ###-#### Internet Inspection Request from: Jan Rice
roof nailing ok.
recheck connections for roof trusses
12/6/2004 10:51:16 AM
|
BLD-Foundation | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 8:09:17 AM. Contact: ###-####.
stemwalls ok. to recall for 6" slab doweled into stem's 9/24/2004 2:16:39 PM
|
BLD-Footing | 9/21/2004 | 9/21/2004 | 9/21/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/21/2004 at 7:01:06 AM. Contact: ###-####.
footings @ perimeter of bldg ok.
copper electrode ok 9/21/2004 2:25:19 PM
|