Permit Information
Permit NumberBLD04-00813
StatusFinaled
Name BANNER BANK
Site Address 1161 W RIVER ST Unit: 310
Project NameFOREST RIVER IX-3RD FLR
Customer Number 
ePlanReviewNo
Description
(BANNER BANK - FOREST RIVER IX - SUITE 310) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To remodel a 4,048 square foot office tenant space located on the 3rd floor of a 48,900 square foot building. Work is to include interior nonbearing walls, interior doors, interior windows, suspended ceilings, and interior finishes all per the approved drawings and the plan review conditions on file. In addition, the restrooms located on the 3rd floor will be upgraded to be accessible to the disabled. The location of fire sprinkler heads within this tenant space shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/9/20048/10/20048/10/2004APASS
DetailsDave Hannah
Don, ###-#### ok for perm occ 8/10/2004 10:11:12 AM
Permanent Occupancy 8/10/20048/10/2004 DONE
Details
BLD-Final7/15/20047/16/20047/16/2004APART
DetailsDave Hannah
ok for temp occ needs to finish ada restrooms and door hardware on two doors 7/16/2004 1:21:23 PM
FIRE-Final Inspection7/13/20047/14/20047/14/2004APASS
DetailsRick Jackson
Don, ###-####
FIRE-Final Inspection7/12/20047/13/20047/13/2004AFAIL
DetailsRick Jackson
Don, ###-#### New rated doors at main exit are on mag hold opens - will require smoke detector for door release and plan submittals 7/13/2004 10:38:22 AM
BLD-Other6/17/20046/18/20046/18/2004PPART
DetailsDave Hannah
Don - ###-#### - ceiling ok to drop in panels after elec ok 6/18/2004 11:49:48 AM
FIRE-Conference6/4/20046/4/20046/4/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/4/2004 at 6:29:34 AM. Contact: ###-####. Don has referenced the 1988 UMC for which the air handlers were installed, therefore the AHU's will not require detectors for shutdown as the units are not new nor being modified 6/4/2004 1:19:00 PM
BLD-Other5/28/20045/28/20045/28/2004PPART
DetailsDave Hannah
Don, ###-#### - fire wall entry one hr corrodor wall at entry ok to cover 5/28/2004 1:24:08 PM
BLD-Framing/Rough-in5/26/20045/26/20045/26/2004PPART
DetailsRuss Owen
Don, ###-####, this needs a electrical,and plumbing r-i contractor on site, also needs to maintain the 1 hr corridor construction over the door contractor may drywall office raes after r-i ,s have been completed , but must call inspection on the area above the corridor. 5/26/2004 3:07:59 PM