BLD-Final | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 1:23:49 PM. Contact: ###-####. pending zoning 2/10/2005 9:13:10 AM
|
BLD-Final | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm occ when others sign perm 2/10/2005 2:25:13 PM
|
Permanent Occupancy | | 2/10/2005 | 2/10/2005 | | DONE |
|
|
|
|
BLD-Final | 2/9/2005 | 2/9/2005 | 2/9/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 10:58:44 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 9 2005 11:08AM.
|
BLD-Final | 2/4/2005 | 2/7/2005 | 2/7/2005 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 11:49:52 AM. Contact: ###-####. needs spec insp report for final 2/7/2005 3:23:23 PM
|
FIRE-Final Inspection | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 2/7/2005 1:50:52 PM
|
FIRE-Final Inspection | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission. Items needing to be corrected are: Label duct smoke detectors for hvac unit location, install fourth annunciator, provide two additional fire extinguishers, provide three remaining fire dampers in the returns and provide the foam filters for the sample tubes for duct detector #3. 1/26/2005 11:02:55 AM
|
FIRE-Conference | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | DONE |
Troy Cobbley
|
|
|
Pat; ###-#### I went over life safety requirements with the contractor and owner. 1/20/2005 2:56:05 PM
|
BLD-Other | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 8:49:48 AM. Contact: ###-####. wall ok 1/18/2005 3:45:59 PM
|
FIRE-Final Inspection | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | CANC |
Troy Cobbley
|
|
|
Per contractor, he actually needed a cover inspection from the structural inspector. 1/18/2005 2:48:46 PM
|
BLD-Conference | 1/13/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Tom Arcoraci
|
|
|
fire barrier 1/13/2005 10:24:15 AM
|
BLD-Foundation | 10/18/2004 | 10/19/2004 | 10/19/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/18/2004 at 11:13:09 AM. Contact: ###-####.
|
BLD-Foundation | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 3:09:20 PM. Contact: ###-####. Steve Cromwell (ENG) No special insp Req. 10/15/2004 9:55:01 AM
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 3:46:55 PM. Contact: ###-####.
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|