Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00937
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2496- 2498 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 4
Customer Number 
ePlanReviewNo
Description
To construct a new 4,359 sq.ft. two story, duplex, with attached garages. Unit Type A is 2,114 sq.ft. two story, three bedroom, 2 1/2 baths, with an attached 451 sq.ft. two car garage, unit Type B is 2,245 sq.ft. two story, three bedrooms, 2 1/2 baths with an attached 484 sq.ft. two car garage. All construction per the approved plans and atached comment list. MJP DRH 02-240 CUP 02-0041
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
BLD-Final11/29/200511/30/200511/30/2005PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/29/2005 at 10:43:16 AM. Contact: ###-####.
DOC - Permit Finaled11/30/200511/30/200511/30/2005PPASS
DetailsTony Young
c of o issued
BLD-Conference10/24/200510/24/200510/24/2005PPART
DetailsTony Young
blake; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
handrail ?s
BLD-Conference10/18/200510/19/200510/19/2005APART
DetailsTony Young
###-#### - jim
conf on final
BLD-Conference10/17/200510/18/200510/18/2005ACANC
DetailsJim Storey
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance6/23/20056/24/20056/24/2005APASS
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in6/21/20056/21/20056/22/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/21/2005 at 8:04:16 AM. Contact: ###-####.
need letter from architect on roof venting, access,,, need f/wall fixes, straps
BLD-Framing/Rough-in6/20/20056/20/20056/20/2005PPART
DetailsJim Storey
ok to insulate south unit/ need fire blk/ pre rock/ box wrap/fire stopping.
BLD-Framing/Rough-in6/17/20056/20/20056/20/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/17/2005 at 3:05:11 PM. Contact: ###-####.
BLD-Framing/Rough-in6/16/20056/17/20056/17/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/16/2005 at 3:19:37 PM. Contact: ###-####.
conf. only,, met w/ plan review,, treat as duplexes or appartments
BLD-Conference6/16/20056/16/20056/16/2005PCANC
DetailsTony Young
jim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in6/8/20056/8/20056/9/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/8/2005 at 8:48:45 AM. Contact: ###-####.
BLD-Framing/Rough-in6/6/20056/6/20056/6/2005PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 6/6/2005 at 7:35:27 AM. Contact: ###-####.
need to nail off shear per plan,, recall
BLD-Conference5/16/20055/16/20055/16/2005PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 5/16/2005 at 9:49:41 AM. Contact: ###-####.
roof nailing 5/16/2005 1:33:23 PM
BLD-Framing/Rough-in4/28/20054/29/20054/29/2005APART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
upper f/wall ok,,, portion of center 4/29/2005 10:39:13 AM
BLD-Conference4/27/20054/28/20054/28/2005ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 4/26/2005 at 3:42:10 PM. Contact: ###-####.firewall ?s
BLD-Framing/Rough-in4/26/20054/27/20054/27/2005PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 4/26/2005 at 3:42:10 PM. Contact: ###-####.
BLD-Conference4/7/20054/8/20054/8/2005APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 4/7/2005 at 3:14:35 PM. Contact: ###-####. floor inspection 4/8/2005 11:03:31 AM
BLD-Foundation3/17/20053/18/20053/18/2005APASS
DetailsTroy James
he has an 11:00 pour///jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing3/11/20053/14/20053/14/2005APART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
building # 4?? ftgs ok,, pending s. i. report 3/14/2005 10:47:57 AM
BLD-Footing3/8/20053/9/20053/9/2005ANR
DetailsTony Young
jim williams ###-####
BLD-Footing3/9/20053/9/20053/9/2005PCANC
DetailsTony Young
jim williams ###-####