Code Occupancy Approval | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | PASS |
Michael Garner
|
|
|
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -
1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES
2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM
3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN
4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.
THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
|
Permanent Occupancy | | 5/17/2007 | 5/17/2007 | | DONE |
|
|
|
|
BLD-Final | 4/10/2007 | 4/10/2007 | 4/10/2007 | P | PASS |
Tony Young
|
|
|
Buddy; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok for perm c of o
|
BLD-Final | 4/3/2007 | 4/4/2007 | 4/4/2007 | A | PASS |
Tony Young
|
|
|
buddy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Final | 4/2/2007 | 4/3/2007 | 4/3/2007 | A | PART |
Tony Young
|
|
|
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith conf walk through,, ok for temp occ pending plumbing final,, then ok for perm c of o pending zoning final
|
FIRE-Final Inspection | 3/30/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Other | 1/2/2007 | 1/3/2007 | 1/3/2007 | P | PASS |
Tony Young
|
|
|
buddy - vapor ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Energy code compliance | 1/3/2007 | 1/3/2007 | 1/3/2007 | P | PASS |
Tony Young
|
|
|
buddy - vapor ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
FIRE-Final Inspection | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | PART |
Forrest France
|
|
|
Cold cavity protection for the 3rd floor at building #7 is satisfactory, one area lacking proper insulation at the SW unit repaired while on site, rough-in is okay to cover.
|
BLD-Framing/Rough-in | 12/19/2006 | 12/22/2006 | 12/22/2006 | P | PART |
Tony Young
|
|
|
Buddy; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
|
BLD-Aging Inspection | 12/14/2006 | 12/14/2006 | 12/18/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 10/10/2006 | 10/10/2006 | 10/11/2006 | P | PASS |
Tony Young
|
|
|
Keil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt exterior shear ok
|
BLD-Framing/Rough-in | 8/16/2006 | 8/16/2006 | 8/17/2006 | P | DONE |
Dave Hannah
|
|
|
keill Note: fire wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PART |
Dave Hannah
|
|
|
keill Note: fire wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to stand fire wall on third floor
|
BLD-Framing/Rough-in | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PART |
Tony Young
|
|
|
keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 1st level firewalls ok
|
BLD-Framing/Rough-in | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | NR |
Tony Young
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Aging Inspection | 6/15/2006 | 6/15/2006 | 6/16/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/29/2006 | 3/29/2006 | 3/29/2006 | | PASS |
Tony Young
|
|
|
work still going on in this permit/project,, per Keil, project super
|
BLD-Aging Inspection | 1/26/2006 | 1/26/2006 | 1/27/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 1/27/2006 | 1/27/2006 | 1/27/2006 | P | PASS |
Tony Young
|
|
|
call 1st, Keil,, find status of job wip
|
BLD-Foundation | 9/28/2005 | 9/30/2005 | 9/30/2005 | A | PART |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 8:09:50 AM. Contact: ###-####.
|
BLD-Aging Inspection | 5/16/2005 | 5/16/2005 | 5/16/2005 | | PASS |
Tony Young
|
|
|
|