Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD04-00943
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2460 -2502 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 8
Customer Number 
ePlanReviewNo
Description
2460 & 2462 N Bogus Rd & 2500 & 2502 N Bogus Basin Rd(HIGHLAND FLOOR PLAN TYPE) To construct a new 13,266 sq.ft. three story, four unit apartment building. The first floor is 4,346 sq.ft. which 2,912 sq.ft. is for the garages, the second floor is 4,440 sq.ft. and the third floor is 4,440 sq.ft. Each unit on the second and thrird floors are single story units, three bedrooms with three bathrooms one full and two 3/4. Note: This building is fire sprinklered per NFPA 13-R for story increase. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/29/20078/29/20078/29/2007 PEND
DetailsTony Young
DOC - Permit Finaled8/29/20078/29/20078/29/2007PPASS
DetailsTony Young
BLD-Final5/22/20075/23/20075/23/2007APASS
DetailsTony Young
Buddy, Cathy W. has final paperwork on her desk; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection5/22/20075/23/20075/23/2007APASS
DetailsForrest France
Fire life safety is acceptable for final.
Permanent Occupancy 5/23/20075/23/2007 DONE
Details
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
BLD-Aging Inspection2/28/20072/28/20072/28/2007 PEND
DetailsTony Young
BLD-Aging Inspection12/15/200612/15/200612/18/2006 PASS
DetailsTony Young
BLD-Final10/10/200610/11/200610/11/2006PPART
DetailsJim Sly
buddy; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OK for Temp Occ.
FIRE-Final Inspection10/10/200610/10/200610/10/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission until the elevator recall has been tested. The elevator is to remain locked out and unusable until all inspections have been passed. All other life safety items have been tested.
BLD-Aging Inspection10/5/200610/5/200610/6/2006 PEND
DetailsTony Young
BLD-Aging Inspection7/17/20067/17/20067/18/2006 PASS
DetailsTony Young
BLD-Energy code compliance4/24/20064/25/20064/25/2006APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Energy code compliance4/18/20064/19/20064/19/2006PPART
DetailsTony Young
Keil ###-#### --- also sprinkler insulation insp with Forrest France 4-19 PM
need some f/block at kitchen, upper south east by f/p
FIRE-Sprinkler Rough-in4/18/20064/19/20064/18/2006PPART
DetailsForrest France
Overhead fire sprinkler is good for cover.
BLD-Framing/Rough-in4/12/20064/13/20064/13/2006PPART
DetailsTony Young
keal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c/n,, ok to insulate,, verify elec. permit for elevator prior to cover,, also sprinklers need another inspection for cover/tenting,,, c/n involves fireblocking w/ mineral wool,, point loads,, nail hangers,, straps on plates
BLD-Aging Inspection3/28/20063/28/20063/28/2006 PASS
DetailsTony Young
BLD-Framing/Rough-in1/19/20061/20/20061/20/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/19/2006 at 3:44:58 PM. Contact: ###-####.
ext. shear ok
BLD-Other1/17/20061/17/20061/17/2006PFAIL
DetailsTony Young
shearing inspection to approve for exterior cover//keil ###-####
need to redo some areas
BLD-Framing/Rough-in10/17/200510/18/200510/18/2005ACANC
DetailsJim Storey
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/19/20057/19/20057/19/2005PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 7/19/2005 at 7:39:50 AM. Contact: ###-####.
BLD-Foundation5/19/20055/20/20055/20/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/19/2005 at 3:14:32 PM. Contact: ###-####.
BLD-Footing5/12/20055/13/20055/13/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/12/2005 at 10:54:25 AM. Contact: ###-####.
south half ftgs ok, wip 5/13/2005 11:02:38 AM
BLD-Footing5/11/20055/11/20055/11/2005PPART
DetailsDave Hannah
ok to pour north half