Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00945
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2476- 2482 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 10
Customer Number 
ePlanReviewNo
Description
2476 & 2478 N Bogus Basin Rd & 2480 & 2482 N Bogus Basin Rd (HARRISON FLOOR PLAN TYPE) To construct a new 10,716 sq.ft. three story, four unit apartment building. The first floor is 3,806 sq.ft. which 2,000 sq.ft. is for the garages, the second floor is 3,946 sq.ft. and the third floor is 2,964 sq.ft. Three units are three bedroom and three and one half baths, one unit is four bedroom and three and one half baths. Note: This building is fire sprinklered per NFPA 13-R. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/29/20078/29/20078/29/2007 PEND
DetailsTony Young
DOC - Permit Finaled8/29/20078/29/20078/29/2007PPASS
DetailsTony Young
BLD-Final5/30/20075/31/20075/31/2007APASS
DetailsTony Young
buddy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
ok for perm occ.
FIRE-Final Inspection5/30/20075/31/20075/31/2007APASS
DetailsForrest France
Final fire life safety inspection passed, noted the provided PFE's to be installed in the units prior to occupancy as required.
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
BLD-Conference4/19/20074/19/20074/19/2007PPASS
DetailsTony Young
Buddy; Phone #: ###-####
ok to keep active
BLD-Aging Inspection4/11/20074/11/20074/19/2007 PASS
DetailsTony Young
BLD-Conference12/29/20061/2/20071/2/2007APART
DetailsTony Young
Keil or Buddy; Phone #: ###-####
conf. on landings in the garage and sidewalk along Bogus road
BLD-Conference12/29/200612/29/200612/29/2006PCANC
DetailsTony Young
Buddy; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Other11/28/200612/1/200612/1/2006APART
DetailsTony Young
buddy - note: caulk and seal ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
exterior shear ok
BLD-Wall cover11/10/200611/13/200611/13/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/10/2006 at 12:22:06 PM. Contact: ###-####.
FIRE-Sprinkler Rough-in11/10/200611/13/200611/13/2006APART
DetailsForrest France
The remainder of 3rd floor is okay to cover, tenting is satisfactory.
BLD-Energy code compliance11/9/200611/9/200611/9/2006PPART
DetailsTony Young
buddy//this is for venting; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
unit A and B ok to cover
FIRE-Conference11/9/200611/9/200611/9/2006PDONE
DetailsForrest France
Tenting inspection for the 3rd floor building #10 as completed by S. Arellano is satisfactory.
BLD-Framing/Rough-in11/6/200611/7/200611/7/2006APASS
DetailsTony Young
buddy; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/6/200611/6/200611/6/2006PPART
DetailsTony Young
buddy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
conf. walk through,,, ok to start insulating walls
BLD-Framing/Rough-in11/3/200611/6/200611/6/2006ANR
DetailsTony Young
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/2/200611/3/200611/3/2006PCANC
DetailsDave Hannah
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith out of time rescheduled for monday am
BLD-Other9/7/20069/7/20069/7/2006PPART
DetailsDave Hannah
kile Note: exterior of bld - shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ext
BLD-Framing/Rough-in9/6/20069/6/20069/6/2006PFAIL
DetailsDave Hannah
Keil, pls call so he can escort you around, please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt shear renail per plan also need engineering on straps and panels on front of bld that are built wrong
BLD-Aging Inspection8/25/20068/25/20068/25/2006 PASS
DetailsTony Young
BLD-Framing/Rough-in6/21/20066/21/20066/21/2006PPART
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
3rd floor f/walls ok
BLD-Framing/Rough-in5/17/20065/18/20065/18/2006APART
DetailsTony Young
tyle; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
all 2nd level f/walls ok
BLD-Framing/Rough-in5/15/20065/16/20065/16/2006APART
DetailsTony Young
keele - Note: party walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
south unit and south side of interior unit on 2nd level firewall ok
BLD-Framing/Rough-in4/18/20064/19/20064/19/2006APART
DetailsTony Young
Keil ###-####
all lower fire walls ok to stand
BLD-Framing/Rough-in4/14/20064/17/20064/17/2006APART
DetailsTony Young
keal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
lower firewall ok
BLD-Aging Inspection4/4/20064/4/20064/4/2006 PASS
DetailsTony Young
ok to keep active,,
BLD-Aging Inspection1/31/20061/31/20062/1/2006 PASS
DetailsTony Young
BLD-Foundation5/17/20055/17/20055/17/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/17/2005 at 7:46:37 AM. Contact: ###-####.
BLD-Footing5/12/20055/13/20055/13/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/12/2005 at 10:50:53 AM. Contact: ###-####.
stair tower walls ok 5/13/2005 11:03:33 AM
BLD-Foundation5/11/20055/11/20055/11/2005PPART
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa stair tower ok to pour
BLD-Foundation5/10/20055/11/20055/11/2005ACANC
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing5/5/20055/6/20055/6/2005APART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
wip,, pumping excess water from part of hole from heavy rain fall last night 5/6/2005 11:22:47 AM