Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-00947
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2452 -2458 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 12
Customer Number 
ePlanReviewNo
Description
2452 & 2454 N Bogus Basin Rd & 2456 & 2458 N Bogus Basin Rd (HARRISON FLOOR PLAN TYPE) To construct a new 10,716 sq.ft. three story, four unit apartment building. The first floor is 3,806 sq.ft. which 2,000 sq.ft. is for the garages, the second floor is 3,946 sq.ft. and the third floor is 2,964 sq.ft. Three units are three bedroom and three and one half baths, one unit is four bedroom and three and one half baths. Note: This building is fire sprinklered per NFPA 13-R. Buildings 11 & 12 meet IBC Section 704.3 for one building and are within the aggregate area. All construction per the approved plans and attached comment list.MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
Permanent Occupancy 5/17/20075/17/2007 DONE
Details
BLD-Aging Inspection4/20/20074/20/20074/27/2007 PASS
DetailsTony Young
BLD-Aging Inspection1/10/20071/10/20071/11/2007 PEND
DetailsTony Young
BLD-Aging Inspection10/31/200610/31/200611/3/2006 PEND
DetailsTony Young
BLD-Final8/30/20068/31/20068/31/2006APASS
DetailsTony Young
Keil; Phone #: ###-####
ok for c of o pending others
BLD-Final8/30/20068/30/20068/31/2006PCANC
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Final Inspection8/28/20068/29/20068/29/2006APASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Final8/24/20068/25/20068/25/2006PCANC
DetailsTony Young
cancelled - not ready per keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Aging Inspection7/24/20067/24/20067/26/2006 PASS
DetailsTony Young
BLD-Aging Inspection4/4/20064/4/20064/4/2006 PASS
DetailsTony Young
work is going to start soon per keil, project super
FIRE-Sprinkler Rough-in1/30/20061/30/20061/30/2006PPART
DetailsForrest France
Inspection for cold cavity protection of the fire sprinkler lines on the remaining third floor unit of this building is acceptable for cover.
BLD-Energy code compliance1/17/20061/17/20061/17/2006PPART
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
ok to cover pending fire sprinkler sign off
FIRE-Sprinkler Rough-in1/6/20061/9/20061/9/2006APART
DetailsForrest France
Inspection for tenting at fire sprinklers good for cover at 3rd floor apt. A east only, the remaining 3 units on the floor not complete at this time.
BLD-Energy code compliance1/4/20061/5/20061/5/2006APART
DetailsTony Young
partial for garage//keil ###-####
garages ok to cover
BLD-Framing/Rough-in12/12/200512/13/200512/13/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/12/2005 at 12:11:51 PM. Contact: ###-####. ok to cover ext
BLD-Framing/Rough-in12/5/200512/5/200512/5/2005PNR
DetailsTony Young
air infiltration inspec and framing//keil; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
conf. walk through only,, need to do some pickup items and recall
BLD-Framing/Rough-in8/17/20058/17/20058/17/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/17/2005 at 7:57:10 AM. Contact: ###-####.
upper f/walls
BLD-Framing/Rough-in8/8/20058/9/20058/9/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/8/2005 at 4:28:59 PM. Contact: ###-####. upper fire walls.
BLD-Conference7/19/20057/19/20057/19/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/19/2005 at 7:37:45 AM. Contact: ###-####.,,,,,,,,,,,,,,,lower firewalls ok
BLD-Framing/Rough-in7/15/20057/18/20057/18/2005PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 7/15/2005 at 3:19:31 PM. Contact: ###-####.
BLD-Foundation4/15/20054/18/20054/18/2005APART
DetailsTroy James
Scheduled by a contractor via Hello! on 4/15/2005 at 11:19:04 AM. Contact: ###-####.
BLD-Footing4/7/20054/8/20054/8/2005APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 4/7/2005 at 3:11:43 PM. Contact: ###-####.