BLD-Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | | PASS |
|
|
|
Final, ok for perm. occ.
|
Permanent Occupancy | | 4/22/2005 | 4/22/2005 | | DONE |
|
|
|
|
BLD-Final | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | CANC |
Jim Sly
|
|
|
randy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Other | 2/3/2005 | 2/3/2005 | 2/3/2005 | | DONE |
|
|
|
Temp. Occ. Cert. extended thru 5-1-05 per letter from JLG.
|
BLD-Final | 10/29/2004 | 11/1/2004 | 11/1/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/29/2004 at 4:59:50 PM. Contact: ###-####. OK for Temp Occ. Need Public works and Code Enforce signatures for Perm......Get Perm Occ status within 90 days of this notice. 11/1/2004 1:28:20 PM
|
Code Occupancy Approval Temp | 10/29/2004 | 10/29/2004 | 10/29/2004 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE TEMP SIGNED OFF 10/29/2004 2:50:19 PM
|
FIRE-Final Inspection | 10/29/2004 | 10/29/2004 | 10/29/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 10/29/2004 3:48:24 PM
|
BLD-Final | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 4:56:14 PM. Contact: ###-####. Need all signatures. 10/28/2004 3:44:51 PM
|
FIRE-Final Inspection | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
|
FIRE-Final Inspection | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
|
BLD-Energy code compliance | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 11:50:31 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 11:49:00 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/31/2004 | 8/31/2004 | 8/31/2004 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/31/2004 at 9:06:56 AM. Contact: ###-####. C/N posted. 8/31/2004 3:24:30 PM
|
BLD-Conference | 7/26/2004 | 7/27/2004 | 7/27/2004 | A | PASS |
Jim Sly
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore 1st Conf..... Discussion of Hold downs (Nail to framing member B 4 gyp) Need new listed assembly and detail from Architect for 1hr studded truss in attic. All gyp shear to break on framing member. 7/27/2004 12:31:07 PM
|
BLD-Foundation | 7/16/2004 | 7/16/2004 | 7/16/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 6:59:22 AM. Foundation wall OK if this is the 4 plex to the north....otherwise disregard. 7/16/2004 1:37:35 PM
|
BLD-Footing | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/15/2004 at 7:10:44 AM. Eng pinned for footing location...... Off cole....S of Ustick. 7/15/2004 12:54:01 PM
|