BLD-Final | 8/11/2004 | 8/11/2004 | 8/11/2004 | | DONE |
|
|
|
Final approved per Jim Storey & Jim Sly in conversation with Jason Blais
|
Permanent Occupancy | | 8/11/2004 | 8/11/2004 | | DONE |
|
|
|
|
BLD-Final | 8/4/2004 | 8/5/2004 | 8/5/2004 | A | FAIL |
Jim Sly
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes C/N still pending.....Need Sprinkler room Ext wall insulated or need paperwork on site to justify that meets energy code W/O insul. Called Ron left message....His voice mail recorder sounds messed up? 8/5/2004 4:05:22 PM
|
BLD-Final | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | CANC |
Jim Storey
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time. 8/4/2004 4:55:51 PM
|
BLD-Final | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | FAIL |
Jim Storey
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes insp. pipe support/ 8/2/2004 9:56:36 AM u-value fror bi-fold doors and aux sprinkler piping tpo framing in warehouse. 8/2/2004 10:19:59 AM
|
FIRE-Final Inspection | 7/21/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled 7/22/2004 8:33:19 AM
|
FIRE-Alarm Testing | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Troy Cobbley
|
|
|
fire alarm portion of the correction list has been corrected 7/15/2004 3:59:33 PM
|
FIRE-Final Inspection | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification that the annual inspection for the sprinkler system will be done this month. Provide door hardware for the new offices. Relocate the smoke detector to be above the fire alarm panel and change the horn/strobe to a horn. City approved plans not required for this work but inspection for function will be required. 7/13/2004 9:48:45 AM
|
BLD-Framing/Rough-in | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | PART |
Jim Storey
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore need mech permit and insp. ceilling ok pending mech. 7/1/2004 5:06:37 PM
|
BLD-Framing/Rough-in | 6/17/2004 | 6/18/2004 | 6/18/2004 | A | PASS |
Jim Sly
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Pinnacle Eng... Pat VanKleek provided letter of approval for Epoxy bolting, Shear wall as built (a change from plans), 6x6 headrs, and double 2x4 (guard) posts in leiu of (1) 4x4 post. Stamped letter of approval provided.. 6/18/2004 11:43:53 AM 6/18/2004 11:47:30 AM
|
BLD-Framing/Rough-in | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | FAIL |
Jim Storey
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n on site not per engineered plan/no si record /start over. 6/16/2004 4:43:03 PM
|