BLD-Final | 8/3/2005 | 8/4/2005 | 8/4/2005 | A | PASS |
Tom Arcoraci
|
|
|
please call 30 min prior to meet///robbie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Final Inspection | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PASS |
Forrest France
|
|
|
Remote anunnciators have been installed and verified for proper functionality. Fire life safety finaled.
|
BLD-Aging Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 | | NR |
Troy Cobbley
|
|
|
Robbie with Dave Evans will follow and call in inspection
|
Code Occupancy Approval | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | PASS |
Scott M.Brown
|
|
|
OK TO SIGN FINAL OCCUPANCY 2/11/2005 1:51:24 PM
|
BLD-Final | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 7:44:31 AM. Contact: ###-####.
c/n on site. Temp. c of o OK. 1/18/2005 2:34:17 PM
|
BLD-Final | 1/13/2005 | 1/14/2005 | 1/14/2005 | P | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/13/2005 at 4:22:46 PM. Contact: ###-####.
need electrical insp. approval for occupancy prior to bldg final 1/14/2005 3:57:55 PM
|
BLD-Final | 1/12/2005 | 1/13/2005 | 1/13/2005 | P | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 4:20:56 PM. Contact: ###-####.
fire insp. corrections to be addressed, and 2nd tenant improvement space to be addressed. 1/13/2005 4:00:23 PM
|
FIRE-Final Inspection | 1/12/2005 | 1/13/2005 | 1/13/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Miller's permission. Items left to complete include remote annunciators for duct smoke detectors. Building plans need to be resubmitted to show the deletion of the south tenant and a MIS permit needs issued for the tenant that is moving in. 1/13/2005 12:14:38 PM
|
FIRE-Final Inspection | 1/11/2005 | 1/12/2005 | 1/12/2005 | P | FAIL |
Troy Cobbley
|
|
|
Repair emergency light on second floor. Provide fire extinguisher on the second floor. Provide remote annunciators for the duct smoke detectors. Provide approved door hardware for the tenant doors and provide sticker at the main exit. 1/12/2005 4:14:39 PM
|
Code Occupancy Approval Temp | | | 1/12/2005 | | FAIL |
|
|
|
TO BOND FOR LANDSCAPE $15,115 + 10% = $ 15266.00
THEN I CAN SIGNE TEMP OCCUPANCY
|
BLD-Framing/Rough-in | 11/9/2004 | 11/10/2004 | 11/10/2004 | P | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/9/2004 at 6:06:37 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/29/2004 | 11/3/2004 | 11/3/2004 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/29/2004 at 12:34:16 PM. Contact: ###-####. Inspection rescheduled from 11/2 am to 11/3 am//cab 11/04/04 C/N posted. 11/3/2004 10:02:25 AM
|
BLD-Framing/Rough-in | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Troy James
|
|
|
Shear only\\###-####\\plans are in plan table by front door
c/n posted front window 10/28/2004 3:56:40 PM
|
BLD-Framing/Rough-in | 10/22/2004 | 10/22/2004 | 10/22/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/22/2004 at 7:57:48 AM. Contact: ###-####. Insp. of tenting or double layered sheetrock boxes over can lights at soffits (W. wall) and 2 layers rock on soffits......OK. 10/22/2004 1:06:27 PM
|
BLD-Framing/Rough-in | 10/20/2004 | 10/21/2004 | 10/21/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/20/2004 at 1:47:42 PM. Contact: ###-####.
|
BLD-Footing | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 11:38:04 AM. Contact: ###-####.
slab w/ #4 rebar, and mats in place as req'd. OK 9/14/2004 9:00:23 AM
|
BLD-Foundation | 8/30/2004 | 8/31/2004 | 8/31/2004 | P | PART |
Lane Manuel
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
perimeter etemwalls w/HD's as noted on appr. plans. OK 8/31/2004 1:46:40 PM
|
BLD-Footing | 8/27/2004 | 8/30/2004 | 8/30/2004 | P | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 8/27/2004 at 10:08:46 AM. Contact: ###-####.
|