Code Occupancy Approval | 5/5/2005 | 5/5/2005 | 5/5/2005 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED AND RELEASE OF BOND 5/5/2005 2:41:04 PM
|
Permanent Occupancy | | 5/5/2005 | 5/5/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | PASS |
Forrest France
|
|
|
###-#### Robbie Fire alarm, life safety, and fire sprinkler finaled.
|
BLD-Final | 4/11/2005 | 4/12/2005 | 4/12/2005 | P | PART |
Jim Sly
|
|
|
###-#### Robbie OK for Temp Occ. Bonded for Landscaping.....Obtain Perm Occ status within 90 days of this notice. OK for Perm Occ apon verification that Code inforce/landscaping OKd for Perm Occ. 4/12/2005 5:01:28 PM
|
FIRE-Final Inspection | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | CANC |
Troy Cobbley
|
|
|
robie -###-####
|
BLD-Final | 4/8/2005 | 4/11/2005 | 4/11/2005 | P | CANC |
Jim Sly
|
|
|
robie-- ###-#### Canc by Contractor. 4/11/2005 4:24:14 PM
|
FIRE-Final Inspection | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | FAIL |
Forrest France
|
|
|
Provide two additional exit signs as discussed and shown on plans, Provide emergency discharge lighting listed for below 32 degrees, Provide building plan review notes
|
BLD-Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 5:14:22 PM. Contact: ###-####.
|
BLD-Final | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | NR |
Tom Arcoraci
|
|
|
robbie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 3/3/2005 | 3/4/2005 | 3/4/2005 | A | DONE |
Troy James
|
|
|
troy scheduled with contractor 8:30 am 3/3/2005 4:27:02 PM
1 hour stair exiting assembly shown on plans and approved. Assembly does not meet 1 hr because contractor will install two layers of 5/8" rock at ceiling of corridor. John Menard approved design because 1 hr assembly is not required per code. 3/4/2005 9:05:02 AM
|
BLD-Wall cover | 3/4/2005 | 3/4/2005 | 3/4/2005 | P | PART |
Troy James
|
|
|
Robby; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok modified 1hr assembly at stairs see previous inspection for clarification 3/4/2005 3:18:20 PM
|
BLD-Framing/Rough-in | 3/3/2005 | 3/3/2005 | 3/3/2005 | P | PART |
Troy James
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover, except for area at 1 hour stairs to see assembly 3/3/2005 3:36:16 PM
|
BLD-Framing/Rough-in | 3/1/2005 | 3/2/2005 | 3/2/2005 | P | FAIL |
Troy James
|
|
|
robie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n posted 3/2/2005 4:11:59 PM
|
BLD-Wall cover | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | PART |
Lane Manuel
|
|
|
Wall cover on Second Floor Only; Phone #: ###-#### Internet Inspection Request from: Robbie Miller
energy insp. ok. R-19 walls 2/24/2005 9:14:16 AM
|
BLD-Framing/Rough-in | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | PART |
Dave Hannah
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore second level ok to insulate 2/23/2005 1:06:22 PM
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 3:21:42 PM. Contact: ###-####.
no mechanical/elec/fire approval 2/17/2005 8:35:39 AM
|
BLD-Wall cover | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 4:46:20 PM. Contact: ###-####.
north/west wing ok for cover. 2/10/2005 12:03:13 PM
|
BLD-Wall cover | 2/9/2005 | 2/9/2005 | 2/9/2005 | P | FAIL |
Troy James
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore still need fire inspection passed 2/9/2005 4:20:46 PM
|
BLD-Energy code compliance | 2/7/2005 | 2/8/2005 | 2/8/2005 | P | CANC |
Lane Manuel
|
|
|
roby; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need fire insp. approval for cover 2/8/2005 2:52:04 PM
|
BLD-Wall cover | 2/7/2005 | 2/8/2005 | 2/8/2005 | P | CANC |
Lane Manuel
|
|
|
roby; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 2/2/2005 | 2/3/2005 | 2/3/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/2/2005 at 4:21:35 PM. Contact: ###-####.
west wing ok to cover pending fire insp., and elec. insp. approval. 2/3/2005 11:15:55 AM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | P | CANC |
Lane Manuel
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
failed elect. insp. Needs to reschedule. 2/2/2005 4:26:26 PM
|
BLD-Framing/Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 3:16:29 PM. Contact: ###-####.
East wing soffit/eave framing ok per approved revision detail. 1/27/2005 9:41:57 AM
|
BLD-Framing/Rough-in | 1/24/2005 | 1/25/2005 | 1/25/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 5:00:52 PM. Contact: ###-####.
east wing framing ok 1/25/2005 4:13:20 PM
|
BLD-Wall cover | 1/24/2005 | 1/25/2005 | 1/25/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 5:01:29 PM. Contact: ###-####.
east wing insul/energy ok 1/25/2005 4:14:33 PM
|
BLD-Framing/Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | FAIL |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 8:35:18 AM. Contact: ###-####.
contr. needs to address fire insp. c/n, and expose areas in studbays to verify HD installations, (already insulated!) 1/24/2005 3:47:08 PM
|
BLD-Framing/Rough-in | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | FAIL |
Lane Manuel
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Wall cover | 1/19/2005 | 1/20/2005 | 1/20/2005 | P | CANC |
Lane Manuel
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 12/1/2004 | 12/2/2004 | 12/2/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 2:36:20 PM. Contact: ###-####. Roof nailing/center only JRR
|
BLD-Framing/Rough-in | 12/1/2004 | 12/2/2004 | 12/2/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 2:36:20 PM. Contact: ###-####. shear ok upper roof and walls, still need to verify from engineer 2x6 studs ok at holdowns 12/2/2004 9:05:44 AM 12/2/2004 9:09:59 AM
|
BLD-Framing/Rough-in | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | PART |
Lane Manuel
|
|
|
Robbie Miller-Shear Wall & Nailing Only; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
roof and shear nailing ok. Engineer to address use of doubled 2x6 s in lieu of 4x members @ 2:12 shear walls (A). 11/15/2004 1:15:58 PM
|
BLD-Framing/Rough-in | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/28/2004 at 10:01:54 AM. Contact: ###-####.
|
BLD-Foundation | 10/6/2004 | 10/6/2004 | 10/6/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 10/6/2004 at 10:02:05 AM. Contact: ###-####.
slab w/ thickened interior footings OK. Verified 2" rigid insulation @ slab/stemwall perimeter 10/6/2004 1:58:34 PM
|
BLD-Foundation | 10/5/2004 | 10/5/2004 | 10/5/2004 | P | NR |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 10/5/2004 at 8:10:39 AM. Contact: ###-####.
contr. to reschedule. No rebar in interior walls/footings 10/5/2004 4:25:12 PM
|
BLD-Foundation | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/10/2004 at 7:27:11 AM. Contact: ###-####.
perimeter stemwalls ok 9/10/2004 3:02:51 PM
|
BLD-Footing | 9/7/2004 | 9/8/2004 | 9/8/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 7:56:07 PM. Contact: ###-####.
perimeter footings/piers ok 9/8/2004 4:19:33 PM
|