BLD-Final | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PART |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Temp Occ. C/N..... Need Mech and Public works to sign for Perm Occ. Obtain Perm Occ status within 90 days of this notice
|
FIRE-Final Inspection | 6/23/2005 | 6/23/2005 | 6/23/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | FAIL |
Forrest France
|
|
|
HVAC RTU at northeast corner of building failed to shut down upon smoke detection, all remaining life safety issues are satisfactory.
|
FIRE-Final Inspection | 6/21/2005 | 6/21/2005 | 6/21/2005 | A | FAIL |
Forrest France
|
|
|
Duct smoke detectors failed to shut HVAC units off upon activation, exit discharge lighting at three locations still not working, door hardware at two doors is not approved.
|
BLD-Final | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | FAIL |
Forrest France
|
|
|
Exit discharge lighting at three locations did not operate under emergency power, max occ. signs not installed, not all door hardware has been installed , still need to test duct smoke detectors and annunciators, hood suppresion system not ready to test.
|
BLD-Final | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | NR |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Met with Troy C and owner to go over code issues. (Fire life/safety and structural issues)
|
FIRE-Final Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on both north doors and the one west exit door from the banquet room. Provide exit discharge lighting on the banquet room doors and the coffee shop doors. Provide maximum occupant load signs for the banquet room "184" and the coffee shop "56". Provide ADA approved hardware on all doors. Install and test the duct smoke detectors and the remote annunciators. Provide hood suppression system for the type 1 hood with permit.
|
FIRE-Final Inspection | 6/14/2005 | 6/15/2005 | 6/15/2005 | A | FAIL |
Troy Cobbley
|
|
|
bill; Phone #: ###-#### Remove thumbturn locks from east exit doors, Provide "Door to remain unlocked when building is occupied" at both of the east exit doors, test duct smoke detectors and provide with approved remote annunciators, provide address numbers viewable from Fairview. Fixed seating is not allowed per shell permit review comments.
|
BLD-Conference | 5/27/2005 | 5/31/2005 | 5/31/2005 | A | CANC |
Jim Sly
|
|
|
bill ###-#### says per dixie's request
|
BLD-Conference | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | DONE |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Letitia Mesa George Slane has had a discussion with the new Contractor (Bill) on this job about his responsibility to follow Requests per Bldg, Plumb, and Mech inspectors per their Correction Notices. George said that the Contractor understands all corrections that are posted. Selected Corrections are as follows. Structural: Do not go beyond the scope of work approved by the City of Boise. Do not cover Plumbing installed W/O permit (ie. for 2nd story R-3) or area of Kitchen where new hood to be located. I have allowed Contr to cover selected areas per appr plan. No additional work to be completed on future tenant spaces, including R-3 space (2nd floor), W/O Bldg permit . Mech Corrections: Do not rock Kitchen. Plumbing was asked to inspect and approve Plumbing installed for R-3 and said they would when a permit is issued. for that area. 4/29/2005 12:24:06 PM 4/29/2005 12:36:30 PM
|
BLD-Conference | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | CANC |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PART |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Ok to rock lid... exept Kitch and portion below 2nd story. 4/15/2005 12:02:22 PM
|
BLD-Framing/Rough-in | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | NR |
Jim Sly
|
|
|
bill ###-#### Complete Corr. 4/12/2005 11:05:34 AM
|
BLD-Framing/Rough-in | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | FAIL |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 4/4/2005 3:14:31 PM
|
BLD-Conference | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | PART |
Jim Sly
|
|
|
###-#### bill Talked with Mike Otto.....Need 1hr roof/ceiling and floor/ceiling assembly through out.... talked with Bill (contractor) about this. 3/25/2005 11:31:17 AM
|
BLD-Conference | 3/23/2005 | 3/24/2005 | 3/24/2005 | A | NR |
Jim Sly
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Jim Sly
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Bill.....(new Contractor) Corr notice.....Notify City of Boise for changes of Gen Contr, Eng of record or Arch of record. Need all Eng and Engineers Calcs. Do not build beyond approved plan. 2/22/2005 3:02:59 PM
|
BLD-Conference | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | DONE |
Lane Manuel
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
spoke w/ contr. regarding roof sheathing issues 2/8/2005 11:50:22 AM
|
BLD-Conference | 1/7/2005 | 1/10/2005 | 1/10/2005 | A | PART |
Jim Sly
|
|
|
Met with Terry of Benchmark Constr. to discuss requirements for completion of this project. They are bidding for the completion. 1/10/2005 12:08:39 PM
|
BLD-Conference | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | CANC |
Jim Sly
|
|
|
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice canncell reschedule monday - Terry
|
BLD-Conference | 12/8/2004 | 12/8/2004 | 12/8/2004 | P | PART |
Jim Sly
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Bill Caferetti........He may be the new Contractor for this job. If so, Advised to change on Case information on project.....Contact City of Boise. Was notified from Mike Otto that B J Developement is no longer the Contractor for this job. 12/8/2004 2:42:56 PM 12/8/2004 2:45:48 PM
|
BLD-Conference | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | NR |
Jim Sly
|
|
|
joan ###-#### Joan called and cancelled. 11/15/2004 9:33:13 AM
|
BLD-Conference | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | CANC |
Tom Arcoraci
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles///canceled per Joan///11/12/01 8:05am BAS
|
BLD-Conference | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | CANC |
Tom Arcoraci
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | PART |
Jim Sly
|
|
|
Joan call 1/2 hr ahead; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Joan.... C/N Any changes on Approved Shell/core plan must be resubmitted to Boise City Plan review for approval. Do not build beyond what is on approved plan. 11/5/2004 11:32:48 AM
|
BLD-Conference | 11/1/2004 | 11/1/2004 | 11/1/2004 | P | PART |
Jim Sly
|
|
|
Joan please call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice 11/1/2004 2:39:52 PM
|
BLD-Other | 6/9/2004 | 6/9/2004 | 6/9/2004 | A | DONE |
Jim Sly
|
|
|
Jennifer called and asked me to issue a STOP WORK at this address. This was completed 6/7/04 AM. Footings and foundation walls poured W/O inspection. Backfill completed and excavators and plumbers were working on underground Plumbing. There is no Temp Electrical installed. Contractor (lady) was on site when I issued Stop work order for Building W/O Bldg permit. Jim Sly (316).
|