BLD-Final | 2/13/2006 | 2/14/2006 | 2/14/2006 | A | PASS |
Jim Sly
|
|
|
Bruce; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong OK for Perm Occ. (:
|
FIRE-Final Inspection | 2/10/2006 | 2/13/2006 | 2/14/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Fire doors operated correctly. Per Sam the links on the stage sides only are ok.
|
Permanent Occupancy | | 2/14/2006 | 2/14/2006 | | DONE |
|
|
|
|
BLD-Final | 2/10/2006 | 2/13/2006 | 2/13/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/10/2006 at 2:45:09 PM. Contact: ###-####.
|
BLD-Final | 1/18/2006 | 1/19/2006 | 1/19/2006 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 10:13:06 AM. Contact: ###-####. OK for Temp OCC.........OK to Perm when Fire perms. ():
|
FIRE-Final Inspection | 1/18/2006 | 1/19/2006 | 1/19/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hanniman's permission. The two roll down fire doors are to remain closed until their operation is worked out. Provide "Fire Doors Do Not Obstruct"signs at both doors and provide occupant load signs for the three assembly areas.
|
FIRE-Final Inspection | 1/13/2006 | 1/18/2006 | 1/18/2006 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
FIRE-Final Inspection | 1/13/2006 | 1/18/2006 | 1/18/2006 | A | CANC |
Troy Cobbley
|
|
|
ran out of time for life safety inspection
|
Code Occupancy Approval | 11/2/2005 | 11/2/2005 | 11/7/2005 | P | PASS |
Carol Montgomery
|
|
|
Complies w/ CUP04-0002 Plans on site. (Addendas 1,2, & 3 dated May 14, 2005.
|
Extend Permit 180 days | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | CANC |
Carol Montgomery
|
|
|
|
BLD-Conference | 10/18/2005 | 10/18/2005 | 10/18/2005 | P | FAIL |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N Ceiling in Auditorium not per Architects original spec.....Architect to approve "as built" auditorium ceiling.
|
BLD-Framing/Rough-in | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | FAIL |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Auditorium Ceiling not per Architects specs. Waiting for Architects approval for "as built" ceiling.
|
BLD-Framing/Rough-in | 9/1/2005 | 9/1/2005 | 9/2/2005 | P | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Ceilings in small rooms OK
|
BLD-Framing/Rough-in | 8/3/2005 | 8/3/2005 | 8/3/2005 | P | CANC |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | FAIL |
Jim Sly
|
|
|
darrell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N Arch to provide detail for Auditorium ceiling
|
BLD-Framing/Rough-in | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/27/2005 at 1:07:06 PM. Provide Eng. standard for Auditorium ceiling and call for insp.
|
BLD-Other | 7/14/2005 | 7/15/2005 | 7/15/2005 | A | DEFR |
Mike Jordan
|
|
|
ross - Note: hookup roof drains to seepage beds - water test inpsect; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Architect to provide UL assembly for top of all 1hr rated walls to metal pan deck.
|
BLD-Framing/Rough-in | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Interior E. & W. Auditorium walls, Ext. eyebrows, and misc interior walls OK.
|
BLD-Framing/Rough-in | 5/26/2005 | 5/27/2005 | 5/27/2005 | A | PART |
Jim Sly
|
|
|
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Looked at all metal stud walls....Need to check Eng for bracing later when time allows.
|
BLD-Framing/Rough-in | 4/26/2005 | 4/27/2005 | 4/27/2005 | A | PART |
Tom Arcoraci
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hard lids in center baths ok and storage areas next to them box beams ok at front entry and rear entry furred aut framing ok at south bathroom and north office area
|
BLD-Framing/Rough-in | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Rated Ceilings in storage rooms OK to cover. 4/8/2005 12:28:45 PM
|
BLD-Framing/Rough-in | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need Listed tested assembly from Architect that is do-able for 1hr ceilings in selected rooms. 4/4/2005 4:40:02 PM
|
BLD-Foundation | 10/21/2004 | 10/22/2004 | 10/22/2004 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Slab and stage wall.... MTI here... OK pending special insp reports and approvals. 10/22/2004 10:30:52 AM
|
BLD-Concrete | 10/12/2004 | 10/13/2004 | 10/13/2004 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing at wall between lobby and auditorium OK pending MTI special insp tests and approvals 10/13/2004 10:09:35 AM
|
BLD-Foundation | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | PART |
Jim Sly
|
|
|
BRUCE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Pouring small Sect of wall N E corner and Sm sect foot @ S E co 9/29/2004 11:49:50 AM
|
BLD-Foundation | 9/22/2004 | 9/23/2004 | 9/23/2004 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Poured most of West wall and footing... A-2 to B-2 OK pending MTI special insp and appr. 9/23/2004 11:36:24 AM
|
BLD-Footing | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | PART |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Foot at West wall and 3/4 of south wall OK Pending special insp reports and appr. 9/17/2004 10:55:40 AM
|
BLD-Foundation | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | NR |
Jim Sly
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore !st pour of foundation walls NR....Need extra verts on order. 9/17/2004 10:56:48 AM
|
BLD-Footing | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PART |
Jim Sly
|
|
|
bruce cell ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie MTI Doing special insp. Partial footing insp at area B OK Pending special insp testing and appr. 9/14/2004 11:12:20 AM
|