Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD04-01308
StatusFinaled
Name EKC INC
Site Address 121 N 9TH ST
Project NamePLAZA 121-PHASE 2
Customer NumberSEE COMMENTS
ePlanReviewNo
Description
(PLAZA 121 - SHELL AND CORE - OLD FIRST SECURITY BUILDING) This building shall be fully fire sprinklered per NFPA 13-2002 as regulated by the Fire Department because it has occupied floors more than 55 feet above the street, to substitute for rated corridors, to allow unprotected openings at the alley, to allow one stair enclosure to pass through a nonrated lobby on the 1st story, etc. To renovate an existing building having 6 stories and a basement (76,680 square feet total). This building is NOT a high-rise. Core restrooms will be constructed in the basement, on the 2nd floor, on the 3rd floor, on the 4th floor, on the 5th floor, and on the 6th floor (12 total). All restrooms are required to be fully accessible to the disabled. Nonstructural demolition work on the 5th and 6th floors was covered under permit BLD04-01570. A 6 story addition, including 2 new elevators, was constructed under permit BLD04-00079. Tenant improvements will be covered under separated permits. Work under this permit is to include interior nonbearing walls, exterior and interior windows, exterior and interior doors, a new stairway to the basement, an extended stairway to the roof, and seismic ties between the West wall and the structural frame all per the approved drawings, engineering, and the plan review report on file. DRH03-00230 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/24/200810/24/200810/31/2008 PASS
DetailsDave Hannah
DOC - Permit Finaled10/31/200810/31/200810/31/2008APASS
DetailsDave Hannah
BLD-Final8/15/20088/15/20088/15/2008PPASS
DetailsDave Hannah
randy Phone #: ###-#### ok for cert of comp
BLD-Aging Inspection8/14/20088/14/20088/15/2008 PASS
DetailsDave Hannah
FIRE-Final Inspection2/26/20082/27/20082/28/2008PPART
DetailsForrest France
Corrections verified for completion, fire life safety inspection passed.
BLD-Aging Inspection2/4/20082/4/20082/12/2008PDEFR
DetailsForrest France
Provide functional EM lighting at all stairways, some need repaired as previously noted.
BLD-Aging Inspection2/4/20082/4/20082/4/2008 DEFR
DetailsDave Hannah
sent to fire
FIRE-Final Inspection11/30/200711/30/200712/4/2007PFAIL
DetailsForrest France
Need to verify functional EM lighting at all three stairways, provide signage at the gates to the basement level in the stariways, remove covering at a fire sprinkler head in the south stairway 1st floor exit discharge.
BLD-Aging Inspection9/12/20079/12/20079/20/2007 FAIL
DetailsDave Hannah
needs fire signoffs walked project with owner
BLD-Final4/11/20064/12/20064/17/2006ADONE
DetailsForrest France
wip, pending alarm and sprinkler permit finals.
BLD-Conference6/22/20056/23/20056/23/2005APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/22/2005 at 1:01:13 PM. Contact: ###-####. fire protection on 3rd floor ceiling ok to start covering
BLD-Other5/16/20055/17/20055/17/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/16/2005 at 12:00:21 PM. Contact: ###-####. ok to insulate
BLD-Framing/Rough-in4/20/20054/20/20054/20/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/20/2005 at 11:06:02 AM. Contact: ###-####. soffit in basement lobby area ok to cover 4/20/2005 2:22:08 PM
BLD-Conference4/5/20054/5/20054/5/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/5/2005 at 10:22:19 AM. Contact: ###-####. smoke dams 4/5/2005 3:17:22 PM
BLD-Conference3/30/20053/31/20053/31/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/30/2005 at 1:16:35 PM. Contact: ###-####.
BLD-Conference3/29/20053/30/20053/30/2005ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/29/2005 at 2:36:11 PM. Contact: ###-####.
BLD-Framing/Rough-in3/28/20053/29/20053/29/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/28/2005 at 1:38:50 PM. Contact: ###-####. needs to check floor pens in restrooms sec thru fifth 3/29/2005 9:55:56 AM
BLD-Conference3/22/20053/23/20053/23/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/22/2005 at 2:57:43 PM. Contact: ###-####.
BLD-Final3/23/20053/23/20053/23/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/22/2005 at 2:57:43 PM. Contact: ###-####. ok for temp occ 3/24/2005 12:00:00 PM
FIRE-Conference3/1/20053/1/20053/1/2005PDONE
DetailsTroy Cobbley
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
BLD-Final2/24/20052/25/20052/25/2005ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/24/2005 at 1:14:56 PM. Contact: ###-####.
BLD-Aging Inspection12/22/200412/22/200412/22/2004 PART
DetailsDave Hannah
wip 12/22/2004 10:09:30 AM