Permit Information
Permit NumberBLD04-01323
StatusFinaled
Name DEVCON CONSTRUCTION INC
Site Address 850 W BROAD ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
BoDo - Building #4 (Shell & Core) - To construct a new 52,260 Square foot, two story, noncombustible, fully fire sprinklered shell and core building for future office, retail and restaurant tenants. This work also includes the construction of a two-hour fire-resitive, noncombustible, four story stair enclosure to be used as the second exit from the new building and the existing four story Foster Building. This new building will wrap around the existing Foster Building and 9th Street Parking Garage. There will be no property lines through or between any of the buildings on this block. Two-hour fire walls will separate these buildings from each other, because of allowable area and construction types. The new building is being constructed with nonseparated uses with the A-2 Occupancy being the most restrictive. The fire sprinkler system is being used for area increase. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permit are required to finish this building for occupancy. All construction per the approved plans and attached comment list. #04-385/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/20/20064/21/20064/21/2006PPASS
DetailsDave Hannah
Forrest should sign-off on the life safety in the AM. If it is signed off we would love to see you just after lunch. Thanks. ok for cc
FIRE-Final Inspection4/21/20064/21/20064/21/2006PPASS
DetailsForrest France
Fire life safety is acceptable, c/n items are complete.
FIRE-Final Inspection4/20/20064/20/20064/20/2006PFAIL
DetailsForrest France
The project related alarm for Foster building failed inspection.
FIRE-Final Inspection4/19/20064/19/20064/20/2006PNR
DetailsForrest France
Project related fire alarm is not finaled.
BLD-Framing/Rough-in2/28/20063/1/20063/1/2006APART
DetailsDave Hannah
Please call Dennis to view fireproofing for a cover-up. He may have already covered-up due because I did not schedule you yesterday....sorry. Internet Inspection Request from: Alex Monge
BLD-Other1/30/20061/31/20061/31/2006APART
DetailsDave Hannah
Inspection of Foster roof straps. Internet Inspection Request from: Alex Monge
BLD-Other1/11/20061/12/20061/12/2006ADONE
DetailsDave Hannah
Foster Building sheating at roof to cover-up with foam.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Final1/4/20061/5/20061/5/2006PNR
DetailsDave Hannah
Final for C of O for Building 4.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Final Inspection1/4/20061/5/20061/5/2006APART
DetailsForrest France
Life safety final pending the completion and final of the related alarm permit for this project which includes BODO 4 and the Foster building monitoring.
BLD-Final10/26/200510/27/200510/28/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final10/25/200510/26/200510/28/2005PFAIL
DetailsDave Hannah
Building 4 Shell & Core final to allow Stratton to operate...2nd floor. Internet Inspection Request from: Alex Monge needs fire sign off and elev sign off along with finishing stair tower fire proofing
FIRE-Final Inspection10/25/200510/26/200510/26/2005PNR
DetailsForrest France
Items on previous inspection correction notice dated 10/24 have not been completed at this time.
BLD-Final10/25/200510/25/200510/26/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs other trades to sign off
FIRE-Final Inspection10/25/200510/25/200510/25/2005PNR
DetailsForrest France
Several items on the correction notice have not been completed as noticed during the course of a related inspection, no inspection performed. Contacted John the GC for notification of the situation.
BLD-Final10/21/200510/24/200510/25/2005PNR
DetailsDave Hannah
Final egress inspection (1st floor only to accomodate PF Chang, Entire building egress will be Thur/Friday. I will schedule for that later) in the afternoon. Please call Alex Monge @ ###-#### when you arrive. Thanks. Internet Inspection Request from: Alex Monge
FIRE-Final Inspection10/21/200510/24/200510/24/2005PFAIL
DetailsForrest France
A 12 item correction list was discussed and left with Gary of Devcon construction for the shell permit life safety.
BLD-Conference10/13/200510/17/200510/18/2005APASS
DetailsDave Hannah
10:00 am conference with Dave Hanna, Sam & Forest. Please call Dennis at ###-#### to cofirm attendance.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Conference10/13/200510/17/200510/17/2005ADONE
DetailsForrest France
On site discussion regarding inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
BLD-Conference10/7/200510/7/200510/10/2005PDONE
DetailsDave Hannah
Conference for PF Chang TCO. Call Alex at ###-#### to confirm time. Internet Inspection Request from: Alex Monge
BLD-Conference9/8/20059/9/20059/9/2005APASS
DetailsDave Hannah
Gary would like an inspection/conference regarding some info. on building 4. Call ###-#### Internet Inspection Request from: Alex Monge
BLD-Conference7/28/20057/29/20058/1/2005PDONE
DetailsDave Hannah
Dave: I would like to do a quick/informal review regarding requirements to open Building 4 Businesses. Please come to the site office-Alex Monge; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/21/20056/22/20056/23/2005APASS
DetailsDave Hannah
Rouhg-framing inspection for Building 4. Call Paul Fishley ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/8/20056/9/20056/9/2005APART
DetailsDave Hannah
Fire safing inspection. Call Paul ###-####. I tried to schedule this today but had a block on our permit. Paul needs this looked at first thing if possible. Thanks..alexmonge ok to coverInternet Inspection Request from: Alex Monge
BLD-Framing/Rough-in5/10/20055/11/20055/11/2005APART
DetailsDave Hannah
Fire Caulking inspection at CMU wall. early am if possible. Call Paul ###-#### Internet Inspection Request from: Alex Mongeeverything thing they have completed is ok
BLD-Conference5/4/20055/5/20055/5/2005APASS
DetailsDave Hannah
preconstruction meeting
BLD-Framing/Rough-in5/2/20055/2/20055/2/2005PPART
DetailsDave Hannah
Core wall framing inspection. Internet Inspection Request from: Alex Monge ok to cover walls on ext gaage side
BLD-Framing/Rough-in4/11/20054/12/20054/12/2005APART
DetailsDave Hannah
Rough framing inspection. Internet Inspection Request from: Alex Monge walked project with forman 4/12/2005 9:29:08 AM
BLD-Concrete3/16/20053/18/20053/18/2005ADONE
DetailsDave Hannah
7:00 am slab on deck pour (2nd pour) Internet Inspection Request from: Alex Monge
BLD-Concrete3/16/20053/17/20053/17/2005APART
DetailsDave Hannah
7:00 slab on deck pour Internet Inspection Request from: Alex Monge
BLD-Conference3/16/20053/17/20053/17/2005ADONE
DetailsDave Hannah
9:00 conference at the Bodo site office w/ Dave Anderson and Paul Fishley.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Concrete2/16/20052/17/20052/17/2005APART
DetailsDave Hannah
Slab on Grade pour - 7:00 am start Internet Inspection Request from: Alex Monge
BLD-Concrete1/28/20051/31/20051/31/2005ADONE
DetailsDave Hannah
6:30 slab on grade pour (1/4 of building) Internet Inspection Request from: Alex Monge
BLD-Footing1/28/20051/28/20051/28/2005PPART
DetailsTom Arcoraci
Concrete footings at east end at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Concrete1/21/20051/24/20051/24/2005APART
DetailsDave Hannah
Slab on Grade pour (North 1/3 of building slab) Internet Inspection Request from: Alex Monge
BLD-Concrete1/18/20051/18/20051/18/2005PDONE
DetailsDave Hannah
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
BLD-Foundation1/17/20051/17/20051/17/2005PDONE
DetailsDave Hannah
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
BLD-Foundation1/13/20051/13/20051/13/2005PPART
DetailsDave Hannah
Grout placement at 1:30 pm Internet Inspection Request from: Alex Monge
BLD-Footing1/12/20051/12/20051/12/2005PPART
DetailsDave Hannah
Concrete at 2:00 pm Internet Inspection Request from: Alex Monge
BLD-Foundation1/12/20051/12/20051/12/2005PPART
DetailsDave Hannah
CMU wall grout at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Footing1/7/20051/7/20051/7/2005PPART
DetailsDave Hannah
1:00 pm concrete at footings. Internet Inspection Request from: Alex Monge
BLD-Foundation1/7/20051/7/20051/7/2005PPART
DetailsDave Hannah
1:30 Grout at CMU wall. Internet Inspection Request from: Alex Monge
BLD-Footing1/3/20051/4/20051/4/2005ADONE
DetailsDave Hannah
1:00 pm concrete pour at footings Internet Inspection Request from: Alex Monge
BLD-Foundation1/3/20051/4/20051/4/2005ADONE
DetailsDave Hannah
10:00 am CMU grout. Internet Inspection Request from: Alex Monge
BLD-Footing12/28/200412/29/200412/29/2004PPART
DetailsDave Hannah
Stem wall and footings at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Foundation12/27/200412/27/200412/27/2004PPART
DetailsDave Hannah
Grout at CMU wall, 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Footing12/22/200412/23/200412/23/2004PPART
DetailsDave Hannah
1:00 column pour. Internet Inspection Request from: Alex Monge
BLD-Footing12/17/200412/20/200412/20/2004PPART
DetailsTom Arcoraci
2:00 pm Footing pour at CMU wall-Northwest corner by Foster building Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:02 PM
BLD-Foundation12/20/200412/20/200412/20/2004PPART
DetailsTom Arcoraci
12:00 Grout at CMU wall. Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:12 PM
BLD-Footing12/16/200412/17/200412/17/2004PPART
DetailsDave Hannah
CMU wall footing pour at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Foundation12/15/200412/16/200412/16/2004PPART
DetailsDave Hannah
Groiut a block courses at 11:30 and 3:00. ; Phone #: ###-####
BLD-Foundation12/14/200412/14/200412/14/2004PPART
DetailsDave Hannah
CMU Grout pour at 2:00 pm; Phone #: ###-####
BLD-Foundation12/10/200412/10/200412/10/2004PDONE
DetailsDave Hannah
Grout 5' lift at CMU wall at 1:00. ; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Foundation12/9/200412/9/200412/9/2004PCANC
DetailsDave Hannah
Grout at CMU wall; Phone #: ###-####
BLD-Concrete12/7/200412/7/200412/7/2004PPART
DetailsDave Hannah
CMU wall second lift grout poor at 12:00 noon.; Phone #: ###-####
BLD-Foundation12/3/200412/6/200412/6/2004PPART
DetailsDave Hannah
Grouting 5' lift of CMU wall adjacent to parking garage at approx. 1:00; Phone #: ###-####
BLD-Conference12/2/200412/3/200412/3/2004ADONE
DetailsDave Hannah
Testing 1-2-3....Not sure if you want a conference w/ Paul Fishley. Call him at the above number to set-up a time.; Phone #: ###-####
BLD-Other12/2/200412/2/200412/2/2004PPART
DetailsDave Hannah
masonry along garage drilling and epoxy mti on site checking 12/3/2004 8:23:05 AM