BLD-Final | 4/20/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Dave Hannah
|
|
|
Forrest should sign-off on the life safety in the AM. If it is signed off we would love to see you just after lunch. Thanks. ok for cc
|
FIRE-Final Inspection | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, c/n items are complete.
|
FIRE-Final Inspection | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | FAIL |
Forrest France
|
|
|
The project related alarm for Foster building failed inspection.
|
FIRE-Final Inspection | 4/19/2006 | 4/19/2006 | 4/20/2006 | P | NR |
Forrest France
|
|
|
Project related fire alarm is not finaled.
|
BLD-Framing/Rough-in | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Dave Hannah
|
|
|
Please call Dennis to view fireproofing for a cover-up. He may have already covered-up due because I did not schedule you yesterday....sorry. Internet Inspection Request from: Alex Monge
|
BLD-Other | 1/30/2006 | 1/31/2006 | 1/31/2006 | A | PART |
Dave Hannah
|
|
|
Inspection of Foster roof straps. Internet Inspection Request from: Alex Monge
|
BLD-Other | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | DONE |
Dave Hannah
|
|
|
Foster Building sheating at roof to cover-up with foam.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Final | 1/4/2006 | 1/5/2006 | 1/5/2006 | P | NR |
Dave Hannah
|
|
|
Final for C of O for Building 4.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PART |
Forrest France
|
|
|
Life safety final pending the completion and final of the related alarm permit for this project which includes BODO 4 and the Foster building monitoring.
|
BLD-Final | 10/26/2005 | 10/27/2005 | 10/28/2005 | P | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 10/25/2005 | 10/26/2005 | 10/28/2005 | P | FAIL |
Dave Hannah
|
|
|
Building 4 Shell & Core final to allow Stratton to operate...2nd floor. Internet Inspection Request from: Alex Monge needs fire sign off and elev sign off along with finishing stair tower fire proofing
|
FIRE-Final Inspection | 10/25/2005 | 10/26/2005 | 10/26/2005 | P | NR |
Forrest France
|
|
|
Items on previous inspection correction notice dated 10/24 have not been completed at this time.
|
BLD-Final | 10/25/2005 | 10/25/2005 | 10/26/2005 | P | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs other trades to sign off
|
FIRE-Final Inspection | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | NR |
Forrest France
|
|
|
Several items on the correction notice have not been completed as noticed during the course of a related inspection, no inspection performed. Contacted John the GC for notification of the situation.
|
BLD-Final | 10/21/2005 | 10/24/2005 | 10/25/2005 | P | NR |
Dave Hannah
|
|
|
Final egress inspection (1st floor only to accomodate PF Chang, Entire building egress will be Thur/Friday. I will schedule for that later) in the afternoon. Please call Alex Monge @ ###-#### when you arrive. Thanks. Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 10/21/2005 | 10/24/2005 | 10/24/2005 | P | FAIL |
Forrest France
|
|
|
A 12 item correction list was discussed and left with Gary of Devcon construction for the shell permit life safety.
|
BLD-Conference | 10/13/2005 | 10/17/2005 | 10/18/2005 | A | PASS |
Dave Hannah
|
|
|
10:00 am conference with Dave Hanna, Sam & Forest. Please call Dennis at ###-#### to cofirm attendance.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
FIRE-Conference | 10/13/2005 | 10/17/2005 | 10/17/2005 | A | DONE |
Forrest France
|
|
|
On site discussion regarding inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
|
BLD-Conference | 10/7/2005 | 10/7/2005 | 10/10/2005 | P | DONE |
Dave Hannah
|
|
|
Conference for PF Chang TCO. Call Alex at ###-#### to confirm time. Internet Inspection Request from: Alex Monge
|
BLD-Conference | 9/8/2005 | 9/9/2005 | 9/9/2005 | A | PASS |
Dave Hannah
|
|
|
Gary would like an inspection/conference regarding some info. on building 4. Call ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Conference | 7/28/2005 | 7/29/2005 | 8/1/2005 | P | DONE |
Dave Hannah
|
|
|
Dave: I would like to do a quick/informal review regarding requirements to open Building 4 Businesses. Please come to the site office-Alex Monge; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 6/21/2005 | 6/22/2005 | 6/23/2005 | A | PASS |
Dave Hannah
|
|
|
Rouhg-framing inspection for Building 4. Call Paul Fishley ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 6/8/2005 | 6/9/2005 | 6/9/2005 | A | PART |
Dave Hannah
|
|
|
Fire safing inspection. Call Paul ###-####. I tried to schedule this today but had a block on our permit. Paul needs this looked at first thing if possible. Thanks..alexmonge ok to coverInternet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 5/10/2005 | 5/11/2005 | 5/11/2005 | A | PART |
Dave Hannah
|
|
|
Fire Caulking inspection at CMU wall. early am if possible. Call Paul ###-#### Internet Inspection Request from: Alex Mongeeverything thing they have completed is ok
|
BLD-Conference | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | PASS |
Dave Hannah
|
|
|
preconstruction meeting
|
BLD-Framing/Rough-in | 5/2/2005 | 5/2/2005 | 5/2/2005 | P | PART |
Dave Hannah
|
|
|
Core wall framing inspection. Internet Inspection Request from: Alex Monge ok to cover walls on ext gaage side
|
BLD-Framing/Rough-in | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | PART |
Dave Hannah
|
|
|
Rough framing inspection. Internet Inspection Request from: Alex Monge walked project with forman 4/12/2005 9:29:08 AM
|
BLD-Concrete | 3/16/2005 | 3/18/2005 | 3/18/2005 | A | DONE |
Dave Hannah
|
|
|
7:00 am slab on deck pour (2nd pour) Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | PART |
Dave Hannah
|
|
|
7:00 slab on deck pour Internet Inspection Request from: Alex Monge
|
BLD-Conference | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | DONE |
Dave Hannah
|
|
|
9:00 conference at the Bodo site office w/ Dave Anderson and Paul Fishley.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | PART |
Dave Hannah
|
|
|
Slab on Grade pour - 7:00 am start Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 1/28/2005 | 1/31/2005 | 1/31/2005 | A | DONE |
Dave Hannah
|
|
|
6:30 slab on grade pour (1/4 of building) Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | PART |
Tom Arcoraci
|
|
|
Concrete footings at east end at 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 1/21/2005 | 1/24/2005 | 1/24/2005 | A | PART |
Dave Hannah
|
|
|
Slab on Grade pour (North 1/3 of building slab) Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | DONE |
Dave Hannah
|
|
|
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/17/2005 | 1/17/2005 | 1/17/2005 | P | DONE |
Dave Hannah
|
|
|
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/13/2005 | 1/13/2005 | 1/13/2005 | P | PART |
Dave Hannah
|
|
|
Grout placement at 1:30 pm Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Dave Hannah
|
|
|
Concrete at 2:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Dave Hannah
|
|
|
CMU wall grout at 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PART |
Dave Hannah
|
|
|
1:00 pm concrete at footings. Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PART |
Dave Hannah
|
|
|
1:30 Grout at CMU wall. Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | DONE |
Dave Hannah
|
|
|
1:00 pm concrete pour at footings Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | DONE |
Dave Hannah
|
|
|
10:00 am CMU grout. Internet Inspection Request from: Alex Monge
|
BLD-Footing | 12/28/2004 | 12/29/2004 | 12/29/2004 | P | PART |
Dave Hannah
|
|
|
Stem wall and footings at 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | PART |
Dave Hannah
|
|
|
Grout at CMU wall, 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Footing | 12/22/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Dave Hannah
|
|
|
1:00 column pour. Internet Inspection Request from: Alex Monge
|
BLD-Footing | 12/17/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Tom Arcoraci
|
|
|
2:00 pm Footing pour at CMU wall-Northwest corner by Foster building Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:02 PM
|
BLD-Foundation | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Tom Arcoraci
|
|
|
12:00 Grout at CMU wall. Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:12 PM
|
BLD-Footing | 12/16/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Dave Hannah
|
|
|
CMU wall footing pour at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 12/15/2004 | 12/16/2004 | 12/16/2004 | P | PART |
Dave Hannah
|
|
|
Groiut a block courses at 11:30 and 3:00. ; Phone #: ###-####
|
BLD-Foundation | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | PART |
Dave Hannah
|
|
|
CMU Grout pour at 2:00 pm; Phone #: ###-####
|
BLD-Foundation | 12/10/2004 | 12/10/2004 | 12/10/2004 | P | DONE |
Dave Hannah
|
|
|
Grout 5' lift at CMU wall at 1:00. ; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 12/9/2004 | 12/9/2004 | 12/9/2004 | P | CANC |
Dave Hannah
|
|
|
Grout at CMU wall; Phone #: ###-####
|
BLD-Concrete | 12/7/2004 | 12/7/2004 | 12/7/2004 | P | PART |
Dave Hannah
|
|
|
CMU wall second lift grout poor at 12:00 noon.; Phone #: ###-####
|
BLD-Foundation | 12/3/2004 | 12/6/2004 | 12/6/2004 | P | PART |
Dave Hannah
|
|
|
Grouting 5' lift of CMU wall adjacent to parking garage at approx. 1:00; Phone #: ###-####
|
BLD-Conference | 12/2/2004 | 12/3/2004 | 12/3/2004 | A | DONE |
Dave Hannah
|
|
|
Testing 1-2-3....Not sure if you want a conference w/ Paul Fishley. Call him at the above number to set-up a time.; Phone #: ###-####
|
BLD-Other | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Dave Hannah
|
|
|
masonry along garage drilling and epoxy mti on site checking 12/3/2004 8:23:05 AM
|