Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD04-01324
StatusFinaled
Name DEVCON CONSTRUCTION INC
Site Address 301 S CAPITOL BLVD
Project NameBODO BUILDING 7
Customer Number 
ePlanReviewNo
Description
BoDo - Building #7 (Shell) - To construct a new 135,950 square foot, three story, noncombustible, fully fire sprinklered shell building for future multi-plex theater, offices, retail and restaurant tenants. The new building is being constructed with nonseparated uses with the A-1 Occupancy being the most restrictive. The fire sprinkler system is being used for area increase. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permit are required to finish this building for occupancy. All construction per the approved plans and attached comment list. Note: This permit is being modified to include the construction of a nonrated corridor to accommodate any future required second exits from any of the future tenant spaces. This corridor is approximately 365 feet long and will run between two exterior doors, one on the south near grid line 2 and on the east at grid line D. DR04-61/ #04-386/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20064/5/20064/5/2006PPASS
DetailsDave Hannah
paul fishley; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for cert of comp
FIRE-Final Inspection4/4/20064/5/20064/5/2006APASS
DetailsTroy Cobbley
Project related alarm and sprinkler have been completed, life safety finaled.
BLD-Final11/10/200511/10/200511/14/2005PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore temp occ issued c/n on site also needs other trades to sign off perm
FIRE-Final Inspection11/9/200511/10/200511/10/2005APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include adding an emergency light in the west projector room and installing the fire extinguishers. The fire alarm and fire sprinkler permits need finalling as well.
BLD-Final11/7/200511/7/200511/9/2005PDEFR
DetailsDave Hannah
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection11/7/200511/7/200511/7/2005PPART
DetailsForrest France
Final not complete, see correction notice for a list of items.
BLD-Final11/3/200511/4/200511/4/2005ANR
DetailsDave Hannah
john --pending bld fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection11/3/200511/4/200511/4/2005AFAIL
DetailsForrest France
Not all curb painting is completed, three exit signs and two emergency lights are not functional, exterior doors are not installed in some locations.
FIRE-Final Inspection11/2/200511/3/200511/3/2005AFAIL
DetailsForrest France
Emergency lighting and exit signs in several locations are not functional, exit doors at north and west sides are not installed yet, some exit discharge lighting is not installed on the east and south sides, fire lane marking remains to be completed, not all items reviewed at this inspection.
FIRE-Final Inspection11/1/200511/2/200511/3/2005ANR
DetailsForrest France
Project is not ready for life safety inspection, several items remain incomplete.
FIRE-Final Inspection10/31/200511/1/200511/2/2005ACANC
DetailsForrest France
No time available to perform this inspection on 11/1 as scheduled, inspection to be rescheduled for 11/2.
BLD-Final11/1/200511/1/200511/1/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked project with dennis will finish tommow
BLD-Final10/31/200510/31/200511/1/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs fire signoffs
Code Occupancy Approval Temp  10/31/2005 DONE
Temp approved
BLD-Framing/Rough-in10/25/200510/26/200510/28/2005APART
DetailsDave Hannah
Ceiling inspection for Shell & Core ground floor corridors. Internet Inspection Request from: Alex Monge ceiling in lobby at front st elev ok to cover
BLD-Conference10/13/200510/17/200510/18/2005APASS
DetailsDave Hannah
10:00 am conference with Dave Hanna, Sam & Forest. Please call Dennis at ###-#### to cofirm attendance.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Conference10/13/200510/17/200510/17/2005ADONE
DetailsForrest France
On site meeting to discuss inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
BLD-Framing/Rough-in10/12/200510/13/200510/14/2005APART
DetailsDave Hannah
Please call Dennis for specifics. Inspection of fire proofing prior to sheet-rock. Internet Inspection Request from: Alex Monge ticket both front entery stair # 2 and #3 ok to cover
BLD-Framing/Rough-in10/13/200510/14/200510/14/2005ADONE
DetailsDave Hannah
Please call Dennis to confirm inspection location. Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in10/12/200510/12/200510/13/2005PPART
DetailsDave Hannah
Check Theater Stair#2 for fire proofing per our request this morning. Thanks. Internet Inspection Request from: Alex Monge columns at tickit both area ok to cover stair tower #2 and elev shaft ok to proseed
BLD-Framing/Rough-in10/11/200510/11/200510/12/2005PPART
DetailsDave Hannah
Check Theater Stair#3 for fire proofing per our request this morning. Thanks. Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in10/10/200510/10/200510/11/2005PPART
DetailsDave Hannah
Check Theater Stair#3 for fire proofing per our request this morning. Thanks. Internet Inspection Request from: Alex Monge ok to start sheet rocking
BLD-Framing/Rough-in10/7/200510/7/200510/10/2005PPART
DetailsDave Hannah
Rough-framing inspection. Call Dennis. Internet Inspection Request from: Alex Monge
BLD-Conference6/29/20056/29/20056/30/2005PPASS
DetailsDave Hannah
Please call Alex at ###-#### of Kelly Bartlet at ###-#### approx. 1/2 prior to your arrival so we can discuss the handrail issue at Office Stair# 2. I would like to meet around 3:00 pm Thank you. Internet Inspection Request from: Alex Monge talked about handrails center rail in stair towers at landings ok as installed with offset
BLD-Other6/24/20056/27/20056/27/2005ADONE
DetailsDave Hannah
Handrail inspection for code acceptability. Dave-we have some concerns about the installed handrail and would like your review prior to final installation. Office Stair#2. Call me (Alex) when you are on your way. Thanks.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/16/20056/17/20056/23/2005APART
DetailsDave Hannah
Framing Final Inspection-Late Morning. Internet Inspection Request from: Alex Monge ext walls second floor
BLD-Framing/Rough-in6/14/20056/16/20056/17/2005PPART
DetailsDave Hannah
Roof smoke seal for cover-up Internet Inspection Request from: Alex Monge fire stopping around roof at curton wall remainder of high roof
BLD-Framing/Rough-in6/14/20056/15/20056/16/2005PPART
DetailsDave Hannah
Rough-Framing for cover-up Internet Inspection Request from: Alex Monge ext walls ok
BLD-Framing/Rough-in6/6/20056/7/20056/7/2005APART
DetailsDave Hannah
Forestop at roof framing. Internet Inspection Request from: Alex Monge curton wall fire stopping 1 hr noryh half broad and lower part of front ok
BLD-Framing/Rough-in6/1/20056/2/20056/2/2005APART
DetailsDave Hannah
Inspection of fire stopping at roof deck and exterior wall. Internet Inspection Request from: Alex Monge fire proofing on curten wall around roof part of 8th st and front st
BLD-Framing/Rough-in5/20/20055/20/20055/23/2005PPART
DetailsDave Hannah
Roof Framing inspection. Internet Inspection Request from: Alex Monge parapet wall framing ok need to fire block curtion wall
BLD-Conference5/4/20055/5/20055/5/2005APASS
DetailsDave Hannah
preconstruction meeting
BLD-Conference3/16/20053/17/20053/17/2005ADONE
DetailsDave Hannah
9:00 conference at Bodo site office w/ Dave Anderson and Paul Fishley.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Concrete2/28/20053/1/20053/1/2005ADONE
DetailsDave Hannah
7:00 am slab on metal deck pour (2nd level) Internet Inspection Request from: Alex Monge
BLD-Concrete2/24/20052/25/20052/25/2005ADONE
DetailsDave Hannah
Second slab on deck pour - 7:00 am Internet Inspection Request from: Alex Monge
BLD-Footing12/28/200412/29/200412/29/2004PPART
DetailsDave Hannah
Footing pour at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Concrete12/20/200412/21/200412/21/2004APART
DetailsDave Hannah
slab on grade pour-6:00 am Internet Inspection Request from: Alex Monge
BLD-Concrete12/15/200412/16/200412/16/2004ADONE
DetailsDave Hannah
Slab on Grade Pour Internet Inspection Request from: Alex Monge
BLD-Foundation12/14/200412/14/200412/14/2004PPART
DetailsDave Hannah
Footing pour at 2:00 pm; Phone #: ###-####
BLD-Footing12/10/200412/13/200412/13/2004PPART
DetailsDave Hannah
Pour pad footings after lunch.; Phone #: ###-####
BLD-Footing12/10/200412/10/200412/10/2004PDONE
DetailsDave Hannah
Pad footing pour after lunch.; Phone #: ###-####
BLD-Footing12/8/200412/9/200412/9/2004PPART
DetailsDave Hannah
Column poad pour between 1:00 and 2:00.; Phone #: ###-####
BLD-Footing12/7/200412/7/200412/7/2004PPART
DetailsDave Hannah
Concrete pour at 2:00 - column pads; Phone #: ###-####
BLD-Foundation12/6/200412/6/200412/6/2004PPART
DetailsDave Hannah
interior coulmn pads on grid line B. 2:00 pour.; Phone #: ###-####
BLD-Footing12/2/200412/2/200412/2/2004PPART
DetailsDave Hannah
Dave Anderson; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Conference11/22/200411/23/200411/23/2004APASS
DetailsDave Hannah
Meeting requested by Dave Hannah with subcontractors- Meeting at 9:00 at DevCon site office.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Conference11/22/200411/23/200411/23/2004APASS
DetailsDave Hannah
Alex; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Footing11/18/200411/19/200411/19/2004APART
DetailsDave Hannah
Alex; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner