Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01386
StatusFinaled
Name OAAS LANEY
Site Address 519 W FRONT ST
Project NameFRONT 5 BUILDING
Customer Number 
ePlanReviewNo
Description
(OAAS LANEY BLDG)(PHASE 2 - SHELL & CORE) Exterior and interior remodel to completely renovate an existing warehouse building for a new use as an office building per approved plans and DRH04-00104. The interior will have unfinished spaces for three future tenants and core area restrooms. No occupancy of tenant spaces allowed under this permit. Separate permits are required for any tenants that want to occupy the spaces. Main floor is 12,947 sq. ft. with 3,400 sq. ft. of mezzanines. Work to include miscellaneous demolition work, new exterior site work, new exterior stairs with handrails and guards, new exterior accessible ramp with handrails and guards, to construct new entry vestibules on north and south sides of building with glass and aluminum panel curtain walls, new exterior windows and doors, new exterior canopies, some new concrete footings/foundations, new exterior retaining walls, structural steel work, to construct new mezzanine areas, CMU wall infill at some locations, reinforcing existing roof framing to support new skylights and new HVAC rooftop units, new roofing system, some new exterior veneer work, new interior walls, new interior doors and windows, new core hallway and restrooms, new core accessible shower room, new phone/data room and fire riser room, four new interior stairways with handrails and cable guards, interior finish, new fire sprinkler system, new mechanical, new plumbing, and new electrical work. Special Inspections required for bolts in concrete, reinforcing steel, structural field welding, high strength bolting, structural masonry, epoxy/adhesive anchor installations, built-up light gauge steel members, structural steel frame, and excavation and back-filling. Building Division Manager approval concerning accessibility and area of mezzanines attached to plans. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is fully fire sprinklered. (PC#0399-04) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20053/18/20053/18/2005APASS
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Code Occupancy Approval3/17/20053/17/20053/17/2005PPASS
DetailsWm. Michael Meloy
Compliance met. 3/17/2005 4:24:54 PM
Code Occupancy Approval3/4/20053/4/20053/4/2005AFAIL
DetailsWm. Michael Meloy
Inspection noted landscaping in ground did not match plans that are on file. Correction notice left with request for an on-sight meeting to discuss the difference. 3/4/2005 11:18:05 AM
FIRE-Final Inspection1/28/20051/28/20051/28/2005PPASS
DetailsRick Jackson
BLD-Conference12/16/200412/16/200412/16/2004PCANC
DetailsDave Hannah
Greg; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Final12/16/200412/16/200412/16/2004PPART
DetailsDave Hannah
Greg; Phone #: ###-#### Internet Inspection Request from: Jan Rice correction notice on site south half completed this is the side with the t/i but still working on north side ok for a temp occ 12/16/2004 3:45:13 PM
BLD-Final12/15/200412/15/200412/15/2004PNR
DetailsDave Hannah
gregg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--peindin fire fn
FIRE-Final Inspection12/15/200412/15/200412/15/2004PPART
DetailsRick Jackson
gregg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need to complete west mezzanine and stair with sprinklers under stairs 12/15/2004 4:52:22 PM
Code Occupancy Approval Temp  12/15/2004 DONE
OK to bond for remaining Landscaping work.
BLD-Conference12/7/200412/7/200412/7/2004PPART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore int stairs talked about closed risers mock up ok 12/8/2004 8:13:24 AM
FIRE-Conference12/7/200412/7/200412/7/2004PPART
DetailsRick Jackson
greg; Phone #: ###-#### Internet Inspection Request from: Barbara MooreMet with GC about extinguisher placement in shell and east TI space 12/7/2004 3:37:21 PM
BLD-Conference11/17/200411/18/200411/18/2004PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/17/2004 at 11:42:27 AM. Contact: ###-####.
BLD-Foundation10/20/200410/21/200410/21/2004APART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore spec inspec will check erbar and test conc 10/22/2004 8:06:19 AM
BLD-Footing10/14/200410/15/200410/15/2004APART
DetailsJim Storey
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles si to verify engineered fix for colm. info on site copy will be supplied for dave at next insp tue. 10/15/2004 9:15:45 AM
BLD-Foundation10/14/200410/15/200410/15/2004APASS
DetailsJim Storey
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles south ramp and walls ok 10/15/2004 9:18:09 AM
BLD-Foundation10/11/200410/11/200410/11/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2004 at 8:24:43 AM. Contact: ###-####. front walls need to move anchor bolts in column steel 10/11/2004 3:01:31 PM
BLD-Framing/Rough-in10/8/200410/8/200410/8/2004PPART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore steel stud walls ok to cover after other trades finish r/is also need engineer to check def in top track and size of box headers over windows in hall walls 10/8/2004 1:35:14 PM
BLD-Footing10/6/200410/7/200410/7/2004APART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to pour ftgs on southside for entry 10/7/2004 9:58:17 AM
BLD-Footing10/5/200410/6/200410/6/2004APART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front entryway ftgs 10/6/2004 1:52:01 PM
BLD-Footing9/22/20049/22/20049/22/2004PPART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing9/20/20049/20/20049/20/2004PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2004 at 8:20:16 AM. Contact: ###-####.
BLD-Footing9/16/20049/16/20049/16/2004PCANC
DetailsDave Hannah
greg ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs tobe checked by spec inspection 9/16/2004 2:11:27 PM