Description |
(OAAS LANEY BLDG)(PHASE 2 - SHELL & CORE) Exterior and interior remodel to completely renovate an existing warehouse building for a new use as an office building per approved plans and DRH04-00104. The interior will have unfinished spaces for three future tenants and core area restrooms. No occupancy of tenant spaces allowed under this permit. Separate permits are required for any tenants that want to occupy the spaces. Main floor is 12,947 sq. ft. with 3,400 sq. ft. of mezzanines. Work to include miscellaneous demolition work, new exterior site work, new exterior stairs with handrails and guards, new exterior accessible ramp with handrails and guards, to construct new entry vestibules on north and south sides of building with glass and aluminum panel curtain walls, new exterior windows and doors, new exterior canopies, some new concrete footings/foundations, new exterior retaining walls, structural steel work, to construct new mezzanine areas, CMU wall infill at some locations, reinforcing existing roof framing to support new skylights and new HVAC rooftop units, new roofing system, some new exterior veneer work, new interior walls, new interior doors and windows, new core hallway and restrooms, new core accessible shower room, new phone/data room and fire riser room, four new interior stairways with handrails and cable guards, interior finish, new fire sprinkler system, new mechanical, new plumbing, and new electrical work. Special Inspections required for bolts in concrete, reinforcing steel, structural field welding, high strength bolting, structural masonry, epoxy/adhesive anchor installations, built-up light gauge steel members, structural steel frame, and excavation and back-filling. Building Division Manager approval concerning accessibility and area of mezzanines attached to plans. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is fully fire sprinklered. (PC#0399-04) JCB
|