BLD-Final | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | PASS |
Dave Hannah
|
|
|
Kent, ###-####
|
BLD-Final | 7/15/2005 | 7/18/2005 | 7/18/2005 | P | PART |
Tony Young
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore temp. occ ok
|
FIRE-Final Inspection | 7/18/2005 | 7/18/2005 | 7/18/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
BLD-Final | 7/14/2005 | 7/15/2005 | 7/15/2005 | P | NR |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Final Inspection | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | FAIL |
Forrest France
|
|
|
Provide curb painting for fire dept. access as shown on plans and per discussion, repair exit sign 2nd floor corridor.
|
BLD-Other | 6/29/2005 | 6/30/2005 | 6/30/2005 | A | FAIL |
Dave Hannah
|
|
|
kent - Note: ceiling cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs more wires on south side of lobby
|
BLD-Framing/Rough-in | 6/17/2005 | 6/17/2005 | 6/20/2005 | P | PART |
Dave Hannah
|
|
|
kent///cover inspection; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceilings in stair towers ok to cover
|
BLD-Framing/Rough-in | 6/14/2005 | 6/15/2005 | 6/15/2005 | A | PASS |
Dave Hannah
|
|
|
KENT NOTE: COVER; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover
|
BLD-Concrete | 10/22/2004 | 10/26/2004 | 10/26/2004 | P | PART |
Dave Hannah
|
|
|
tony - Note; checking for mess and before pour; pouring slab before wed morn Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/22/2004 | 10/25/2004 | 10/25/2004 | A | FAIL |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs mti to sign off soils 10/25/2004 11:01:43 AM
|