BLD-Final | 12/22/2004 | 12/23/2004 | 12/23/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 7:20:56 PM. Contact: ###-####.
|
BLD-Final | 12/22/2004 | 12/22/2004 | 12/22/2004 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 11:09:17 AM. Contact: ###-####. max 4 inch spacing on gaurdraliings. 12/22/2004 4:48:56 PM
|
BLD-Grading Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 10/12/2004 | 10/13/2004 | 10/13/2004 | A | PASS |
Troy James
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
|
BLD-Energy code compliance | 10/12/2004 | 10/12/2004 | 10/12/2004 | P | FAIL |
Troy James
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Not ready for insulation inspection, framing corrections ok. 10/12/2004 1:41:38 PM
|
BLD-Framing/Rough-in | 10/7/2004 | 10/8/2004 | 10/8/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/7/2004 at 2:52:25 PM. Contact: ###-####. c/n posted 10/8/2004 3:29:21 PM
|
BLD-Concrete | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Troy James
|
|
|
stem wall inspection please///ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 8/2/2004 | 8/2/2004 | 8/2/2004 | P | PART |
Troy James
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip informed contractor footings need to be 12" thick per plans. 8/2/2004 2:01:40 PM
|
BLD-Grading Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
|
|
|
Footing subgrade approved by the geotechnical engineer
|