Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD04-01513
StatusFinaled
Name VIDEO EYE CORPORATION
Site Address 9465 W EMERALD
Project NameVIDEO EYE
Customer Number 
ePlanReviewNo
Description
(VIDEO EYE)(SUITES 100 & 200) To construct a tenant space occupying spaces on the first and second floors consisting of 11,249 sq.ft. of warehouse & production area on the 1st floor, and 7,513 sq.ft. of office on the 2nd floor per approved plans. Work to include, construction of accessible restroom on the first floor, construction of interior partitions, installation of suspended ceiling system and lighting, connecting new duct work to existing Hvac system, related interior finshes, this building is fully fire sprinkered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#427-04) rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection11/4/200511/7/200511/7/2005APASS
DetailsTroy Cobbley
life safety finaled
BLD-Final11/4/200511/7/200511/7/2005APASS
DetailsMike Jordan
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ
Permanent Occupancy 11/7/200511/7/2005 DONE
Details
BLD-Final10/18/200510/19/200510/19/2005ANR
DetailsMike Jordan
Doug, ###-#### - call 1st so he can meet you there : ). Has issues on special insp. that need resolved. Also needs to repair door hardware.
FIRE-Final Inspection10/18/200510/19/200510/19/2005AFAIL
DetailsTroy Cobbley
Need to install the indicators for the keyed locks on the balconies and remove the deadbolt on the 2nd floor storage room
FIRE-Final Inspection7/19/20057/19/20057/19/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Renn Ross's permission until all door hardware has been installed and approved and the one hour room for the fire sprinkler riser is complete. Dead bolts need to be removed from the three storage rooms and indicators need to be installed on the balcony doors.
FIRE-Final Inspection7/15/20057/15/20057/15/2005PCANC
DetailsTroy Cobbley
Request for temp; ###-####
FIRE-Final Inspection7/13/20057/14/20057/14/2005AFAIL
DetailsTroy Cobbley
doug; Phone #: ###-#### Provide exit discharge lighting and approved hardware at the first floor southeast exterior door or remove hardware and exit sign. Provide fire extinguishers as marked in red on drawing sheets A1 and A2. Provide/repair exit signs and emergency lights as marked on sheets E1 and E2. Provide missing door hardware on all doors.
BLD-Wall cover2/24/20052/25/20052/25/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/24/2005 at 3:06:15 PM. Contact: ###-####.
Interior layer of drywall at elevator shaft ok 2/25/2005 9:09:08 AM
BLD-Framing/Rough-in1/4/20051/5/20051/5/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/4/2005 at 4:04:58 PM. Contact: ###-####.
interior walls @ TI ok to cover. 1/5/2005 10:11:32 AM
BLD-Energy code compliance12/8/200412/9/200412/9/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/8/2004 at 5:03:38 PM. Contact: ###-####.
BLD-Framing/Rough-in12/6/200412/7/200412/7/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/6/2004 at 12:58:37 PM. Contact: ###-####.
ok to cover interior walls.
Contractor to leave all "hard" ceiling areas uncovered for future sprinkler insp. 12/7/2004 11:55:47 AM