BLD-Final | 2/15/2005 | 2/16/2005 | 2/16/2005 | P | PASS |
Tom Arcoraci
|
|
|
###-#### - scott lc issued 2/16/2005 2:44:58 PM
|
FIRE-Final Inspection | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled 2/16/2005 10:42:01 AM
|
FIRE-Final Inspection | 1/7/2005 | 1/10/2005 | 1/10/2005 | A | FAIL |
Troy Cobbley
|
|
|
###-#### - scott Provide approved door hardware on both the south and the north facing exit doors. One door can have keyed hardware on the egress side. See review note #4. Provide sticker at the keyed door. Remove the manual flush bolts on these same doors. Emergency lighting not required per Dan Stuart. 1/10/2005 11:10:01 AM
|
BLD-Final | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 10:44:36 AM. Contact: ###-####. needs all sign offs 1/3/2005 2:37:18 PM
|
BLD-Framing/Rough-in | 10/27/2004 | 10/27/2004 | 10/27/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 8:20:53 AM. ok to cover int walls 10/27/2004 2:59:25 PM
|