Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-01632
StatusFinaled
Name FOUNDATION
Site Address 950 W BANNOCK ST
Project Name10TH & BANNOCK
Customer Number 
ePlanReviewNo
Description
10TH & BANNOCK BUILDING - Excavation, Grading and Drainage and Foundation Permit - This permit is for the excavation for the building foundation, the site grading and drainage work and the construction of the reinforced concrete foundation for the future twelve story, 189,920 square foot, office and retail building. The foundation work to be completed under this permit includes the footings, piers, grade beams, slab on grade, concrete walls up to grade and wall dowels at grade. All construction per the approved plans on file. #04-457/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/29/20068/30/20068/30/2006APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
DOC - Permit Finaled8/30/20068/30/20068/30/2006PPASS
DetailsDave Hannah
Code Occupancy Approval  6/12/2006 PASS
Inspection at 12:30 found compliance has been met.
BLD-Energy code compliance6/27/20056/28/20056/27/2005ACANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton Inspection cancelled from web by: Bob Thornton
FIRE-Supply Line Cover6/14/20056/14/20056/14/2005APART
DetailsForrest France
Underground fire supply vaults are allowed to be installed under this excavation and grading permit per Sam Rogers. Vaults match submitted plans of type and installation method, OK to cover.
FIRE-Sprinkler Rough-in6/13/20056/13/20056/13/2005PFAIL
DetailsForrest France
###-#### Bob Underground fire supply storage tanks appear to have been installed without a fire permit. This work must cease until a fire permit is obtained or verification is given that this work is allowed under BLD04-01632.
BLD-Concrete6/2/20056/3/20056/6/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/2/2005 at 1:55:08 PM. Contact: ###-####.
BLD-Concrete5/22/20055/24/20055/24/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/22/2005 at 6:45:24 PM. Contact: ###-####.
BLD-Concrete5/22/20055/23/20055/24/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/22/2005 at 6:44:38 PM. Contact: ###-####.
BLD-Concrete5/10/20055/11/20055/16/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/10/2005 at 6:23:02 PM. Contact: ###-####.
BLD-Conference5/4/20055/4/20055/4/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2005 at 3:56:44 PM. met with geo tech on site over seeing the drilled peirs for the most project going ok they will get me paperwork on peirs
BLD-Conference5/4/20055/4/20055/4/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2005 at 3:56:44 PM. crew is placing conc for section of shear wall met with spec ins all going ak
BLD-Concrete5/3/20055/4/20055/4/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2005 at 3:56:44 PM.
BLD-Concrete4/26/20054/27/20054/28/2005ADONE
DetailsDave Hannah
BLD-Concrete4/26/20054/27/20054/28/2005APART
DetailsDave Hannah
BLD-Concrete4/26/20054/26/20054/26/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/26/2005 at 7:21:03 AM. Contact: ###-####.
BLD-Concrete4/21/20054/21/20054/21/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/19/20054/20/20054/20/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/20/20054/20/20054/20/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/18/20054/19/20054/19/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/19/20054/19/20054/19/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/7/20054/11/20054/11/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/7/2005 at 9:38:53 AM. Contact: ###-####.
BLD-Concrete4/2/20054/4/20054/4/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/2/2005 at 2:25:02 PM. Contact: ###-####.
BLD-Foundation3/21/20053/21/20053/21/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/21/2005 at 10:24:51 AM. Contact: ###-####.
BLD-Foundation3/16/20053/16/20053/16/2005PPART
DetailsDave Hannah
###-#### - bob strata has signed off rebar placement starts this afternoon 3/17/2005 10:28:02 AM
BLD-Footing3/9/20053/9/20053/9/2005PPART
DetailsDave Hannah
###-#### - bob