Permanent Occupancy | | 5/23/2005 | 5/23/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/23/2005 | 5/23/2005 | | DONE |
|
|
|
|
BLD-Final | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PASS |
Jim Storey
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok
|
BLD-Final | 4/5/2005 | 4/7/2005 | 4/7/2005 | A | CANC |
Dave Hannah
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Final Inspection | 4/1/2005 | 4/4/2005 | 4/4/2005 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
BLD-Final | 4/1/2005 | 4/4/2005 | 4/4/2005 | P | PART |
Jim Storey
|
|
|
GLEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles NEED HANDRAIL ON STAIRS AND PW AND ACHD SIGN OFF FOR TEMP PENDING ELE.
|
FIRE-Final Inspection | 3/30/2005 | 4/1/2005 | 4/4/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety pass.
|
Code Occupancy Approval | 4/4/2005 | 4/4/2005 | 4/4/2005 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 4/4/2005 12:02:05 PM
|
BLD-Final | 3/30/2005 | 4/1/2005 | 4/1/2005 | P | NR |
Dave Hannah
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 3/25/2005 | 3/30/2005 | 3/30/2005 | A | NR |
Jim Storey
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Final Inspection | 3/29/2005 | 3/29/2005 | 3/29/2005 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled 3/29/2005 12:32:54 PM
|
FIRE-Final Inspection | 3/25/2005 | 3/29/2005 | 3/29/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide emergency lighting in the northwest staff room, provide verification of duct smoke detector being required. 3/29/2005 10:45:13 AM
|
BLD-Conference | 1/7/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Rick Jackson
|
|
|
Nobody at job site 1/7/2005 2:11:21 PM
|
BLD-Framing/Rough-in | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Jim Storey
|
|
|
glenn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing and insulation ok for cover. 1/7/2005 3:01:32 PM
|
BLD-Energy code compliance | 1/5/2005 | 1/6/2005 | 1/6/2005 | A | NR |
Jim Storey
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 1/3/2005 | 1/4/2005 | 1/4/2005 | P | PART |
Jim Storey
|
|
|
glenn Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles strap top plates at 2nd floor mlb/seal draft stop / plowin insulation markers. roof sheer ok bt engineer of record on file. 1/4/2005 3:40:23 PM
|
BLD-Framing/Rough-in | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | NR |
Jim Storey
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Jim Storey
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice 1st floor exterior ok for sheer nail. 11/16/2004 10:28:33 AM
|
BLD-Foundation | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | PART |
Jim Storey
|
|
|
Glen- Would like an early inspect-slab inspec; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner slab ft ok need re run on mec check or 2 inch thermal break thru slab. 11/4/2004 4:28:03 PM
|
BLD-Footing | 10/20/2004 | 10/20/2004 | 10/20/2004 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Footing | 10/18/2004 | 10/19/2004 | 10/19/2004 | A | PASS |
Jim Storey
|
|
|
ready 1st thing; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|