BLD-Final | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | PASS |
Troy James
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 11/5/2004 | 11/5/2004 | 11/5/2004 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 10/15/2004 | 10/15/2004 | 10/15/2004 | P | PASS |
Jim Storey
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie vestabual. 10/15/2004 3:34:50 PM
|
FIRE-Conference | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | PART |
Rick Jackson
|
|
|
Met with GC about the door hardware, exit sings and required exiting from this space as the exsisting door had exit sign and none to be added on the approved plans; will need architect involvement to verify exiting 10/11/2004 3:55:59 PM
|
BLD-Footing | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | PASS |
Jim Storey
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 9/20/2004 | 9/21/2004 | 9/21/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/20/2004 at 12:56:47 PM. Contact: ###-####.///cancelled per Ryan///9/21/04 8:31am BAS
|