Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-01705
StatusFinaled
Name IDAHO ELK'S REHABILITATION HOSPITAL
Site Address 600 N ROBBINS RD
Project NameIDAHO ELK'S REHAB
Customer Number 
ePlanReviewNo
Description
(HYPERBARIC FACILITY)(IDAHO ELK'S REHABILITATION HOSPITAL-1ST FLR) 3rd PLAN MODIFICATION 2/23/05 - To remodel a 2,974 sq.ft. area in the north east portion of the 1st floor per approved plans. A "Letter of Compliance" is required. Work includes construction of a two (2) hour fire-barrier wall along the east side of the new hyperbaric chamber room area. This remodel will convert approximately 1,500 sq. ft. from "B" occupancy to become part of the existing 7,576 sq. ft. "I1.2" creating a 9,076 sq. ft., "I" occupancy suite. Construction of walls to be non-combustible framing with fire-rated sheetrock covering; interior finishes, cabinetry, electrical, mechanical, plumbing, sprinkler & alarm system upgrades to meet tenant needs and minimum codes. PC04-479/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20056/9/20056/9/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/9/2005 at 8:17:49 AM. Contact: ###-####. ok for l/c
BLD-Final6/8/20056/8/20056/9/2005PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/8/2005 at 9:07:57 AM. Contact: ###-####.
FIRE-Final Inspection6/9/20056/9/20056/9/2005APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final6/6/20056/6/20056/7/2005PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/6/2005 at 9:31:26 AM. Contact: ###-####.
BLD-Final6/6/20056/7/20056/7/2005ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/6/2005 at 11:33:45 AM. Contact: ###-####.
FIRE-Final Inspection6/6/20056/6/20056/6/2005PPART
DetailsForrest France
Final pending fire alarm sign off.
BLD-Other6/1/20056/1/20056/2/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/1/2005 at 7:32:31 AM. Contact: ###-####. ceiling grid front area ok to cover
BLD-Other5/25/20055/25/20055/25/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/25/2005 at 9:00:51 AM. Contact: ###-####. ceiling grid office area ok
BLD-Other5/23/20055/24/20055/24/2005PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/23/2005 at 10:54:44 AM. Contact: ###-####. ceiling grid still not per plans
BLD-Framing/Rough-in5/19/20055/20/20055/23/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/19/2005 at 3:33:13 PM. Contact: ###-####.ceiling gred ok
BLD-Framing/Rough-in4/7/20054/8/20054/8/2005PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 4/7/2005 at 9:22:43 AM. Contact: ###-####.