BLD-Final | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Jim Sly
|
|
|
gil --call 1st before insp -re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. :)
|
FIRE-Conference | 6/3/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed.
|
Permanent Occupancy | | 6/6/2005 | 6/6/2005 | | DONE |
|
|
|
|
BLD-Final | 6/2/2005 | 6/3/2005 | 6/3/2005 | P | PART |
Jim Sly
|
|
|
gil --please call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp Occ. Need dampers and complete firestopping Bsmnt.
|
FIRE-Final Inspection | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Framing/Rough-in | 4/28/2005 | 4/28/2005 | 4/28/2005 | P | PART |
Jim Sly
|
|
|
ceiling grid inspection and call prior to going out please///gill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa grid ok . 4/28/2005 4:15:46 PM
|
BLD-Energy code compliance | 3/3/2005 | 3/3/2005 | 3/3/2005 | P | PASS |
Jim Sly
|
|
|
gill--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PART |
Dave Hannah
|
|
|
Please call prior to inspection///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2/28/2005 4:29:01 PM checked hold downs added on inside per new engineering ok framing ok to insulate check fire blocking at energy code inspection 2/28/2005 4:34:53 PM
|
BLD-Conference | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | PASS |
Jim Sly
|
|
|
gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Discussed 1hr Flr/Ceil assembly Bsmnt. 2/24/2005 4:35:03 PM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | FAIL |
Jim Sly
|
|
|
SHEAR INSPECTION PLEASE///gill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Nailing OK, but many missed hold downs and HDs in wrong locations. Do per plan, or Eng to approve. 2/2/2005 11:22:05 AM
|
BLD-Foundation | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | PASS |
Jim Sly
|
|
|
gill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Final section of footing at N wall OK. 1/3/2005 12:47:22 PM
|
BLD-Foundation | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | FAIL |
Jim Sly
|
|
|
FYI....Pouring concrete at 8:30///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Poured W/O inspection. 12/21/2004 10:08:56 AM
|
BLD-Footing | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell Footing OK except West end of North wall.....Need compaction test and footing insp this area. 12/15/2004 11:12:06 AM
|
BLD-Foundation | 11/19/2004 | 11/22/2004 | 11/22/2004 | A | PASS |
Jim Sly
|
|
|
Gil they will be pouring at 1:00 need late morning insp.; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Footing | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PASS |
Jim Sly
|
|
|
Late am please///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2500 PSI design. 11/17/2004 9:47:02 AM
|