BLD-Final | 7/5/2005 | 7/5/2005 | 7/5/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/5/2005 at 8:07:28 AM. Contact: ###-####. OK for Perm Occ. ():
|
FIRE-Final Inspection | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 6/30/2005 | 7/1/2005 | 7/1/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 4:41:26 PM. Contact: ###-####. Need Fire and ........
|
FIRE-Final Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 9:23:38 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide additional address numbers, provide fire extinguisher for the second floor, remove exit sign to warehouse, provide duct smoke detectors and annunciators as discussed.
|
Code Occupancy Approval | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | PASS |
Carol Montgomery
|
|
|
|
Permanent Occupancy | | 6/29/2005 | 6/29/2005 | | DONE |
|
|
|
|
BLD-Other | 6/28/2005 | 6/28/2005 | 6/28/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 7:24:29 AM. Contact: ###-####. Grid OK
|
BLD-Conference | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 10:10:42 AM. Contact: ###-####.
|
BLD-Wall cover | 4/20/2005 | 4/21/2005 | 4/21/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 3:05:26 PM. Contact: ###-####. Frame and energy Pass. 4/21/2005 3:13:47 PM
|
BLD-Framing/Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 5:13:11 PM. Contact: ###-####. OK to Insulate....Need to inspect for firestopping at blocking (fireblock) 4/15/2005 12:33:53 PM
|
BLD-Conference | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/14/2005 at 10:05:29 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 5:13:20 PM. Contact: ###-####. Shear naling OK.......Need to check retro fit HD's at frame. 2/18/2005 12:38:11 PM 2/18/2005 12:38:50 PM
|
BLD-Foundation | 11/22/2004 | 11/22/2004 | 11/22/2004 | P | PASS |
Jim Sly
|
|
|
Craig- this is for insulation board on foundation; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Foundation | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/18/2004 at 9:04:59 AM. Contact: ###-####.
stemwalls ok.
no ufer @ time of inspection. 11/18/2004 2:01:00 PM
|
BLD-Foundation | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | NR |
Jim Sly
|
|
|
Ken; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner No plans on site. 11/16/2004 11:09:51 AM
|
BLD-Foundation | 11/16/2004 | 11/16/2004 | 11/16/2004 | P | PASS |
Jim Sly
|
|
|
Ken; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner 2500 PSI No special insp Req.
11/16/2004 1:34:12 PM 11/16/2004 1:34:49 PM
|
BLD-Conference | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/8/2004 at 1:44:55 PM. Contact: ###-####. 11/9/2004 10:16:48 AM Went through plans with Greg of Lacy Plumbing.....Special insp Req on everything.......Need letter from Eng. for 2500 design strength Conc. Otherwise Special insp Req. Turn N. in front of Scub A Dub car wash. 11/9/2004 10:19:38 AM 11/9/2004 10:21:50 AM
|