Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-01722
StatusFinaled
Name BERGEY CONSTRUCTION
Site Address 516 S 9TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(ESTHER SIMPLOT PERFORMING ARTS ACADEMY - DOOR AND WINDOWS AT STAIRWAY) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction. To construct nonbearing walls and install a door and several windows on the first story of an existing building. The new construction will be at the top of a stairway that serves the 09th Street entrance to this building. This stairway serves only the basement and first story. Work is to include 2x4 walls with 5/8" gypsum board, a 36 inch wide door, and several windows with safety glass all per the approved drawings and the plan review report on file. Within the remodel area, the location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/21/20049/22/20049/22/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/21/2004 at 10:09:12 AM. Contact: ###-####. Sprinkler spacing not affected by new wall; okay for final 9/22/2004 11:05:19 AM
BLD-Final9/20/20049/21/20049/21/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2004 at 11:52:24 AM. Contact: ###-####. ok after fire life saftey sign off 9/21/2004 10:18:55 AM
BLD-Framing/Rough-in8/30/20048/30/20048/30/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/30/2004 at 11:09:15 AM. Contact: ###-####.