(HEALTHSOUTH SLEEP CENTER LAB)(W BOISE PROF COMPLEX) To construct a 3,851sq.ft. medical office with 4 sleep rooms per approved plans work to include, construction of accessible restrooms, one accessible shower stall, interior partitions, installation of a rated door and side lite in an existing corridor, construction of a medical gas closet and related piping, installation or miscelaneous counters and cabinets in exam rooms and nurses station. Miscelaneous related finishes throughout tenat space. This building is fully fire sprinklered any alterations or modifications to the sprinkler sytem shall be per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/22/200412/23/200412/23/2004APASS
DetailsLane Manuel
Don, ###-####

perm c of o ok 12/23/2004 11:20:03 AM
Permanent Occupancy 12/23/200412/23/2004 DONE
Details
BLD-Final12/21/200412/22/200412/22/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/21/2004 at 11:36:50 AM. Contact: ###-####.
temp c of o ok.

need ada signage, and wrap copper lavatory lines 12/22/2004 10:27:00 AM
FIRE-Final Inspection12/16/200412/17/200412/17/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 12/17/2004 3:54:46 PM
BLD-Other12/3/200412/6/200412/6/2004AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 12/3/2004 at 1:15:16 PM. Contact: ###-####. need seismic pods in two large rooms, ok to lay tile, leave ceiling exposed at location for reinspection. 12/6/2004 9:28:18 AM
BLD-Framing/Rough-in10/28/200410/28/200410/28/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/28/2004 at 6:23:18 AM. Contact: ###-####. ok pending all othr inspectors 10/28/2004 10:11:19 AM
FIRE-Conference10/25/200410/25/200410/25/2004ADONE
DetailsTroy Cobbley
I found backboxes and conduit installed on this project for the fire alarm system. I posted a stop work order for the installation of the fire alarm system and the installation of sheet rock (which will cover the conduit and backboxes). I don't know at this time who started to install the fire alarm system.