BLD-Final | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/21/2005 at 11:35:38 AM. Contact: ###-####. ok for perm occ
|
Permanent Occupancy | | 6/22/2005 | 6/22/2005 | | DONE |
|
|
|
|
Code Occupancy Approval | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | PASS |
Dena Gambrel
|
|
|
Pass Final Occupancy. Bike rack is in and posts removed. Bond can be released.
|
FIRE-Final Inspection | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | CANC |
Forrest France
|
|
|
Duplicate inspection, not required.
|
FIRE-Final Inspection | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled, HVAC units shut down properly as required.
|
FIRE-Final Inspection | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection, HVAC units did not shut down immediately upon smoke test.
|
FIRE-Final Inspection | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | FAIL |
Troy Cobbley
|
|
|
Duct smoke detectors are not wired for immediate shutdown of the hvac units. Need to rewire and retest.
|
BLD-Final | 4/8/2005 | 4/11/2005 | 4/11/2005 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 4:28:36 PM. Contact: ###-####. cn posted ok for temp occ 4/11/2005 4:25:11 PM 4/11/2005 4:25:35 PM
|
BLD-Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 5:23:56 PM. Contact: ###-####.
|
FIRE-Final Inspection | 4/6/2005 | 4/7/2005 | 4/7/2005 | P | FAIL |
Forrest France
|
|
|
Remove thumbturn from south exit, provide approved hardware on the pocket door on the restroom, provide duct smoke detectors on the two hvac units
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 9:28:59 AM. Contact: ###-####. ok to cover all but stairs to basement 2/16/2005 10:02:13 AM
|
BLD-Footing | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### - corwin
|
BLD-Concrete | 12/1/2004 | 12/1/2004 | 12/1/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 8:08:29 AM. Contact: ###-####.
Doing new footing work in phases.
Intermittent sections ok. To recall for other sections when ready for insp. 12/1/2004 12:38:30 PM
|