BLD-Final | 7/5/2005 | 7/6/2005 | 7/6/2005 | A | PASS |
Dave Hannah
|
|
|
mark ###-#### ok for perm occ
|
Permanent Occupancy | | 7/6/2005 | 7/6/2005 | | DONE |
|
|
|
|
BLD-Final | 6/28/2005 | 6/28/2005 | 6/29/2005 | P | FAIL |
Dave Hannah
|
|
|
mark vangulik needs hand rail mens restroom grabbar
|
Code Occupancy Approval | 6/20/2005 | 6/20/2005 | 6/22/2005 | P | PASS |
Michael Garner
|
|
|
|
Code Occupancy Approval | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | PASS |
Michael Garner
|
|
|
inspection complete - officer satisfied with landscaping and parking
|
DOC - Permit Finaled | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | PASS |
Michael Garner
|
|
|
|
BLD-Final | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | PART |
Troy James
|
|
|
temp. occ. , need grab bar at mens and reinstall soff at front door 4/13/2005 3:05:54 PM
|
BLD-Final | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | FAIL |
Troy James
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
grab bar in restroom and signage, need bond for exterior landscape 4/12/2005 4:33:30 PM
|
FIRE-Final Inspection | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | FAIL |
Forrest France
|
|
|
Still need duct detectors to be provided/tested on the two hvac units
|
FIRE-Final Inspection | 4/4/2005 | 4/4/2005 | 4/5/2005 | P | FAIL |
Troy Cobbley
|
|
|
Mount fire extinguishers, Provide ada approved hardware on the pocket door and provide duct smoke detectors per approved drawings and test
|
FIRE-Final Inspection | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | FAIL |
Forrest France
|
|
|
Contact: (###-####) Fail inspection per items defficient including; Provide max occupant load sign, mount address, repair exit discharge light at door #2 and #3, test all emergency lights, provide exit discharge lighting at door #7.
|
BLD-Final | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 7:56:32 AM. Contact: ###-####.
|
BLD-Wall cover | 12/27/2004 | 12/28/2004 | 12/28/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/27/2004 at 5:08:01 PM. Contact: ###-####.ok to cover insulated and hold downs installed 12/28/2004 9:56:24 AM
|
BLD-Energy code compliance | 12/20/2004 | 12/22/2004 | 12/22/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 5:00:06 PM. Contact: ###-####.seal package ok to insulate 12/22/2004 12:44:05 PM
|
BLD-Wall cover | 12/20/2004 | 12/22/2004 | 12/22/2004 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 5:00:47 PM. Contact: ###-####. not insulated 12/22/2004 12:44:27 PM
|
BLD-Framing/Rough-in | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 4:59:18 PM. Contact: ###-####. ok to start insulating needs to install two replacment hold downs 12/21/2004 10:00:24 AM
|
BLD-Foundation | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 7:44:29 AM. Contact: ###-####.
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 4:23:19 PM. Contact: ###-####.
|